USPTO serial 98661804
BAJA ELEVATED SOLAR SUPPORT SYSTEMS
Reviewed by CopyMark Law Group
Status 730Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- PATTERSON, MARY A
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with BAJA ELEVATED SOLAR SUPPORT SYSTEMS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*
Plus Government fees of $300
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew J. Smith
Matthew J. Smith Polsinelli PCPO Box 140310Kansas City, MO 64114-0310United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Construction elements made of metal, namely, fabricated metal components for building foundations; Construction elements made of metal, namely, supports; Cladding of metal for construction and building; Structure joint connectors of metal; Arbours of metal used as structures; Metal structures for mounting solar panels; Portable buildings made primarily of metal; Portable metal buildings; Arbors of metal; Arbours of metal; Awnings of metal; Beams of metal; Beams of common metal for building; Building boards of metal; Building materials, namely composite panels composed primarily of metal; Building panels of metal; Buildings, transportable, of metal; Ceiling boards of metal; Ceiling panels of metal; Ceiling supports of metal; Coverings of metal for ceilings; Metal beams; Metal pillars for buildings; Metal posts; metal roofing; Metal roofing panels; Metal stanchions; ; Metal storage shelters; Metal storm shelters; Metal supports for use as outdoor post foundations; Prefabricated metal carports for recreational vehicles (RVs), namely, light gauge, pre-galvanized, high-tensile straight steel carport design structures with engineered pier footing foundations; Prefabricated metal carports for recreational vehicles (RVs), namely, light gauge, pre-galvanized, high-tensile straight steel carport design structures with engineered pier footing foundations that mount solar panels | ACTIVE | — |
| 037 | Construction consultancy; construction of steel structures; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction, repair and maintenance of buildings; Construction, repair and maintenance of buildings, and providing information relating thereto; Building construction; Building construction and repair; Building construction consultancy services; Building construction for civil infrastructure projects; Building construction services; Building construction supervision; Building construction supervision services for building projects; Consultancy services relating to the construction of buildings; Installation and maintenance of solar energy based power plants; Installation of solar energy systems and alternative energy products for residential and commercial use; Installation of utilities in construction sites; Installation, maintenance and repair of solar collectors; Installation, maintenance and repair of solar energy systems; Installation, maintenance and repair of solar installations for generating power; Installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; Providing information relating to building construction; Provision of construction advice; Provision of information in relation to building construction; Provision of technical information in the field of building construction; Removal and reinstallation of solar panels; Steel structure construction works; Supervision of building construction; Technical consultation in the field of building construction | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BAJA CONSTRUCTION CO., INC.
- Other trademarks owned by BAJA CONSTRUCTION CO., INC.
- Other trademarks owned by Robert Hayworth
- Other trademarks in Class 006
- Other trademarks in Class 037
- Similar marks named BAJA ELEVATED SOLAR SUPPORT SYSTEMS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 9, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 8, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 8, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 8, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 17, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 20, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 20, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 14, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 18, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 4, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 4, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 4, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 12, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 12, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 12, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 7, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 7, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Apr 29, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Feb 7, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 7, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 7, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 30, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 16, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 15, 2025 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jan 10, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 10, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 10, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 8, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Nov 8, 2024 | ALIE | ASSIGNED TO LIE | — |
| Oct 21, 2024 | WOAG | WITHDRAWAL OF ATTORNEY GRANTED | — |
| Oct 21, 2024 | WOAR | TEAS WITHDRAWAL OF ATTORNEY RECEIVED | — |
| Aug 21, 2024 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jul 23, 2024 | NWAP | NEW APPLICATION ENTERED | — |