USPTO serial 98717626
ECOGREEN
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- MORENO, PAUL A
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ECOGREEN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction services, namely, installation of environmental containment systems; Installation of geothermal energy based power plants; Installation of power generating apparatus; Installation of reactive power compensation apparatus; Installation of renewable energy generation equipment; Installation of solar energy systems and alternative energy products for residential and commercial use; Installation of solar heating systems; Installation of wiring and power supply equipment for transmission and distribution of electricity suitable for electric vehicle recharging stations; Installation of wiring in accessible geographical locations for distribution of electricity suitable for electric vehicle recharging stations; Installation and maintenance of solar energy based power plants; Installation and maintenance of solar thermal installations; Installation and maintenance of photovoltaic/solar thermal hybrid installations; Installation, maintenance and repair of batteries and accumulators; Installation, maintenance and repair of solar installations for generating power; Installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; Installation, maintenance and repair of solar collectors; Installation, maintenance and repair of solar energy systems; Maintenance of power generating apparatus and installations; Recharging of batteries and accumulators; Installation, maintenance and repair of power generating apparatus; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 29, 2025 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Dec 29, 2025 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| May 27, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 1, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 1, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 26, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 10, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 3, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 22, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 26, 2024 | NWAP | NEW APPLICATION ENTERED | — |