USPTO serial 98740562
FENECON
Reviewed by CopyMark Law Group
Status 730Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- CORWIN, CHARLOTTE K
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with FENECON?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,246*
Plus Government fees of $600
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Iggensbach, DE
Iggensbach, DE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michele M. Glessner
Michele M. Glessner Womble Bond Dickinson (US) LLP301 S. College St., Suite 3500Charlotte, NC 28202-6050United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Accumulators for photovoltaic power; solar panels for the production of electricity; photovoltaic apparatus and installations for generating solar electricity, namely, monitoring and control apparatus for photovoltaic installations; solar batteries for domestic use; solar batteries for industrial use; solar-powered rechargeable batteries; memory modules; computer memory devices; home, commercial and industrial electricity storage systems comprised of electrical storage batteries and photovoltaic solar modules for the production of electricity; apparatus and instruments for accumulating and storing electricity; apparatus and instruments for accumulating the distribution of electricity; apparatus and instruments for controlling electricity; rechargeable electrical cells; electrical cells and batteries; electrical power distribution units; photovoltaic inverters; inverters for power supply; apparatus and instruments for transforming electricity; apparatus and instruments for accumulating electricity; electric control devices for energy management; photovoltaic apparatus for converting solar radiation to electrical energy namely, photovoltaic solar modules; downloadable computer programs for network management; uninterruptable electrical power supply apparatus; electric power distribution apparatus in the nature of electric power distribution machines, blocks, and units; apparatus and instruments for transforming the use of electricity; apparatus and instruments for transforming the distribution of electricity; mains testers, namely, voltage testers; electric power analyzers; electric current transformers; electric current switches; electric current meters; electronic power supplies; apparatus in the nature of meters for measuring, monitoring and analyzing electricity consumption; electric current control devices; regulated power supply apparatus; instruments for distributing electrical current; voltage-to-current converters; voltage regulators for electric power; electricity current limiters; power units, namely, electrical power distribution units; electricity measuring instruments, namely, clamp meters; switchboxes; power line conditioners; electricity storage apparatus in the nature of batteries; voltage surge protectors; electric power units, namely, electrical power distribution units; power distributors in the nature of electrical power distribution blocks; panels for the distribution of electricity, namely, power distribution panels; power distributing boxes; converters, electric; lithium iron phosphate batteries; lithium iron phosphate battery; power conditioning apparatus, namely, transient voltage surge suppressors with power conditioning technology | ACTIVE | — |
| 035 | Retail store and wholesale store services featuring batteries, solar modules, electricity storage apparatus; retail store and wholesale store services featuring network support components. | ACTIVE | — |
| 037 | Maintenance and repair of solar power installations; installation of solar panel systems for commercial and residential buildings; construction of utility solar installations; repair of energy supply installations; replacement of batteries. | ACTIVE | — |
| 039 | Rental of electricity storage facilities. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by FENECON GmbH
- Other trademarks owned by FENECON GmbH
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 039
- Similar marks named FENECON
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 27, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 27, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 27, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 27, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 3, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 9, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 9, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 3, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 7, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 7, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 7, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 7, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 7, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 19, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| May 9, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 9, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 9, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 14, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 17, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 9, 2024 | NWAP | NEW APPLICATION ENTERED | — |