USPTO serial 98752757
SEABOARD
Reviewed by CopyMark Law Group
Status 654
- Filing date
- Status date
- Registration date
- —
- Examiner
- WATTS-FITZGERALD, CAITLIN C
- Law office
- TMO LAW OFFICE 111
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SEABOARD?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Fort Worth, TX, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Richard J. McKenna
Richard J. McKenna Foley & Lardner LLP777 East Wisconsin AvenueMilwaukee, WI 53202-5306United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Engines not for land vehicles; Industrial Engines; Oil-well pumping machines; Drilling machines and parts therefore; Slurry blender machines for use in oil or gas well hydraulic fracturing operations; Oil field equipment, namely, drilling rig mechanization machines and devices; Oil field equipment, namely, drilling rig mechanical handling machines and devices; Oil field production machines for extracting oil from geological layers and processing hydrocarbons; Oil field equipment, namely, vent lines, well heads, valve assemblies, gate valves, packers, intervention packers, permanent packers, packers actuated by electrical submersible pumps, pumps, pressure boosters for pumps, retrievable packers, pocket packers, cased hole packers, open hole packers, ram packers, rams, setting tools, non-explosive setting tools, motorised setting tools, hangers, intervention hangers, suspension hangers, retrievable hangers, plugs, hanger plugs, bridge plugs, high pressure plugs, slips, mechanical slips, hydraulic slips, control units for chokes, chokes, variable chokes, hydraulically-operated chokes, hydraulically-operated gate valves, blowout preventers, rod clamps, rod rotators, control units for blowout preventers, ram preventers, annular preventers, annulus packoffs, actuators, valve actuators, plug valves, manifolds, parts, fittings and accessories for the aforesaid goods; Fluid couplings being parts of machines | ACTIVE | — |
| 037 | Construction of production modules in the oil and gas industry; Installation of oil production apparatus; Repair and maintenance of oil and gas well drilling tools and equipment; Rental of oil and gas well drilling tools and equipment; Installation of oil well casings, tubing and drill pipes | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 6, 2026 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 5, 2026 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jan 5, 2026 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jan 5, 2026 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jan 5, 2026 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Dec 23, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 23, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 23, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 25, 2025 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 25, 2025 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 25, 2025 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 24, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 23, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 23, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 20, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Jun 20, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Mar 24, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 24, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 24, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 24, 2025 | LOPE | LETTER OF PROTEST EVIDENCE REVIEWED - ACTION TAKEN | — |
| Mar 24, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 23, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 4, 2025 | LOPT | LETTER OF PROTEST EVIDENCE FORWARDED | — |
| Sep 16, 2024 | NWAP | NEW APPLICATION ENTERED | — |