Drawing for KEEN

USPTO serial 98771053

KEEN

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
PENDLETON, CAROLYN A
Law office
TMEG LAW OFFICE 103

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with KEEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher A. Proskey

Christopher A. Proskey BrownWinick Law Firm666 Grand Avenue, Suite 2000Des Moines, IA 50309United States

Goods and services

ClassDescriptionStatusFirst use
037Architectural and engineering services; Architectural design in the field of commercial buildings, industrial buildings, agricultural buildings, governmental buildings, municipal buildings, buildings for use by non-profit organizations, medical establishments, factories, warehouses, and retail facilities; Architectural design services; Building construction consulting; Building construction services; Building construction supervision services; Building construction supervision; Building construction; Building demolition; Building demolition; Building design services, namely, commercial building design services, industrial building design services, governmental building design services, and municipal building design services; Building maintenance; Building refurbishing; Building remodeling; Building renovation; Building repair; Building restoration; Carpentry and carpentry contractor services; Construction consultancy and advisory services in the fields of construction and building project re-purposing; Construction consultation; Construction feasibility study services; Construction information; Construction maintenance and renovation of property; Construction of buildings; Construction of commercial buildings; Construction of modular buildings; Construction of residential buildings, commercial buildings, industrial buildings, agricultural buildings, governmental buildings, municipal buildings, medical establishments, factories, warehouses, and retail facilities; Construction phase planning services; Construction planning; Construction project management services; Construction scheduling services; Construction services, namely, construction consultation, construction planning, construction management, construction project management, and construction supervision; Construction services, namely, construction management; Construction services, namely, planning, laying out, and custom construction of residential buildings, commercial buildings, industrial buildings, agricultural buildings, governmental buildings, municipal buildings, medical establishments, factories, warehouses, and retail facilities; Constructions services, namely, general construction contracting; Consultation in building construction supervision; Consultation services in the field of construction of environmentally conscious buildings; Consulting in the field of building construction; Consulting services in the field of architecture and engineering design; Consulting services in the field of construction; Consulting services in the field of building design; Consulting services in the field of construction planning; Custom construction and building renovation; Design-build construction services, namely, building construction services; Design-build services, namely, building construction services; Design-build services, namely, building design services; Engineering services for building and property condition assessment, facility management, repair and restoration, and building instrumentation; Erecting of commercial centers and manufacturing plants; General building contractor services; General construction contracting services in the fields of building construction; General construction contracting services; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, and building and framing contractor services; Land development services, namely, planning and laying out of commercial buildings, industrial buildings, agricultural buildings, governmental buildings, municipal buildings, medical establishments, factories, warehouses, and retail facilities; Planning and laying out of commercial buildings, industrial buildings, governmental buildings, municipal buildings, medical establishments, factories, warehouses, and retail facilities; Planning of buildings and infrastructure systems for buildings; Pre-construction planning services, namely, construction scheduling, construction phase planning, conducting construction feasibility studies, conducting constructability reviews and construction design reviews; Pre-construction services, namely, construction budgeting; Pre-construction services, namely, construction scheduling, construction phase planning, conducting construction feasibility studies, identification of construction materials with long lead times, conducting constructability reviews and construction design reviews; Pre-construction services, namely, cost estimating; Pre-construction services, namely, providing construction cash flow projections; Providing news and information in the field of building construction; Real estate development services; Real estate site selection services; Self-perform construction skilled trades, namely, concrete work, carpentry, and selective demolition services; Steel erection services; Steel structure construction services; Steel structure construction worksACTIVEAug 6, 2014

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jul 30, 2025MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jul 30, 2025ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 15, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 19, 2025DOCKASSIGNED TO EXAMINER—
Sep 26, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 26, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance