USPTO serial 98784040
SYNCRIS
Reviewed by CopyMark Law Group
Status 807Office Action
- Filing date
- Status date
- Registration date
- —
- Examiner
- ODUSAMI, OLUWAKEMI KEHINDE
- Law office
- TMO LAW OFFICE 117
What this means
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
Need help with SYNCRIS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Minneapolis, MN, US
Minneapolis, MN, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Greene
Jeffrey H. Greene FOLEY & LARDNER LLP90 Park AvenueNew York, NY 10016-1314United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Inverters for use in connection with electrical power distribution systems; batteries for use in connection with electrical power distribution systems; electric control devices for microgrids; electric control devices for aggregating power generated from microgrids; Recorded computer software for monitoring, analyzing, and controlling the distribution of electricity through electrical power systems and electrical power grids; electronic modules, namely, computing modules and devices to process electricity data of distributed energy resources, namely, solar inverters and other devices connected to the electric grid, namely, battery storage devices, batteries, electric panels, and microgrid controllers | ACTIVE | Sep 19, 2024 |
| 037 | Construction and construction planning of energy microgrids, energy storage systems, and alternative energy sources; installation, repair, and maintenance of energy microgrids, energy storage systems, and alternative energy sources; technological planning and consulting services in the nature of consulting on installation and maintenance of renewable energy equipment and facilities in the field of microgrids and energy storage systems | ACTIVE | Apr 1, 2024 |
| 040 | Technical consulting services in the field of electrical power generation; generation of power through operation of power generation equipment and facilities | ACTIVE | Apr 1, 2024 |
| 042 | Technical consulting services in the field of electrical power grid engineering, namely, testing and evaluation of electric power distribution machines; design of power generation systems, energy storage systems, and microgrids; consulting services in the field of engineering relating to remote energy solutions, namely, microgrids, hybrid microgrids and battery storage | ACTIVE | Apr 1, 2024 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Renew Power Systems Inc
- Other trademarks owned by Renew Power Systems Inc
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named SYNCRIS
- Prosecution event GNRN explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 1, 2026 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 1, 2026 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 1, 2026 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 8, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 8, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 8, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 8, 2026 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 28, 2026 | IUAF | USE AMENDMENT FILED | — |
| Apr 28, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Apr 28, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 28, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Nov 11, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 16, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 16, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 10, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 13, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 8, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 8, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 9, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 9, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 7, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 3, 2024 | NWAP | NEW APPLICATION ENTERED | — |