USPTO serial 98784172
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Lexington, KY, US
Lexington, KY, US
Lexington, KY, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael S. Hargis
Michael S. Hargis Stites & Harbison, PLLC250 W. Main Street, Suite 2300Lexington, KY 40507United States| Class | Description | Status | First use |
|---|---|---|---|
| 036 | Land acquisition services; arranging finance for construction projects; conducting financial feasibility studies; financial advice, namely, budget planning | ACTIVE | — |
| 040 | Manufacture of general product lines in the field manufacturing equipment to the order and specification of others | ACTIVE | — |
| 042 | Engineering design services; commissioning services, namely, providing system testing and verification, control, automation, and systems integration verification, operator training, and performance validation in the field of manufacturing facility builds, expansions, and retrofits, equipment and process skid installations, and system integration and automation projects; structural engineering design services; engineering services in the field of food and beverage production; providing planning and engineering services in the field of information and communications networks; product development and engineering services for others; consulting in the field of structural engineering; technology consulting services in the field of data analytics engineering; engineering design services, namely, processing system design and process equipment integration plan design; engineering design services in the fields of process and packaging systems; engineering design services, namely, network design for connecting information technologies and operation technologies; computer security threat analysis for protecting informational technologies and operational technologies; engineering design services, namely, developing independent network solutions for others; engineering services for building and property condition assessment; engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; engineering services in the field of reducing operational costs of industrial machinery; engineering services, namely, engineering for the food and beverage industry; civil engineering; mechanical engineering; electrical engineering; consulting services in the field of design, planning, selection, implementation and use of computer hardware and software systems for others; consulting services in the field of manufacturing control systems and automated control systems; consulting services in the field of manufacturing system automation; design and development of control systems and automated control systems for manufacturing; integration of computer systems and networks; IT integration services; integrating control system hardware into existing manufacturing automation and control systems; technological consultancy services for digital transformation; technological consulting services in the field of digital transformation of manufacturing processes; consultancy and information services relating to information technology architecture and infrastructure; information technology consulting relating to computer network design; data security consultancy; consulting services relating to the collection, analysis, and display of information within manufacturing systems; consulting services relating to data analytics; consulting services in the design and implementation of computer-based information systems for businesses; technical consulting services in the field of batch control systems used in manufacturing systems; consultation about the maintenance and updating of computer software; consultation about the maintenance and updating of enterprise resource planning computer software for others; consulting services relating to the integration of data with enterprise resource planning computer software; consulting services for others in the field of design, planning, and implementation project management of manufacturing facility construction, expansion, and control system upgrades; planning and designing automation and packaging control systems and networking systems for manufacturing facilities; facility construction, expansion, and control system upgrades; consulting services relating to operational technology networks in manufacturing facilities; computer network design, implementation, and maintenance in the field of manufacturing; consulting services in the field of virtualization technologies for enterprises and businesses; technology consulting in the fields of servers, virtual services, data storage and data delivery; technology consultation in the field of cybersecurity; computer and computer network security consultation; computer security consultancy in the field of scanning and penetration testing of computers and networks to assess information security vulnerability; computer technology consultancy in the field of operational technology networks; internet security consulting; design of computer-simulated models; computer graphics design services, namely, creating of 3D computer models and animation of production facilities and processes; technology consulting in the field of manufacturing processes; technological consulting services in the field of manufacturing processes; consultation in the field of ergonomics, namely, designing workplace facilities and equipment to optimize efficiency and safety; food safety testing and consultation related thereto; implementation services in the field of project management, namely, pre-commissioning equipment, equipment identification, commissioning equipment, acceptance testing, monitoring deliveries of equipment, equipment startup; technology consulting in the field of manufacturing automation; consulting services in the field of manufacturing automation; technology consulting in the field of humanoid robots; consulting services in the field of humanoid robots; integration of humanoid robots into existing manufacturing processes and facilities; consulting services relating to the integration of humanoid robots into manufacturing processes and facilities; technology consulting in the field of visioning systems; consulting services in the field of visioning systems; integration of visioning systems into existing manufacturing processes and facilities; technology consulting in the field of autonomous mobile robots and automated guided vehicles; consulting services in the field of autonomous mobile robots and automated guided vehicles; integration of autonomous mobile robots and automated guided vehicles into existing manufacturing processes and facilities; technical support services, namely, 24/7 service desk or help desk services; technical support services, namely, 24/7 monitoring of network systems, servers and web and database applications and notification of related events and alerts; technical support services, namely, troubleshooting of industrial process control computer software problems; technical support services, namely, remote and on-site infrastructure management services for monitoring, administration and management of computer hardware and software, computer network systems, servers, and data storage devices; technical support services, namely, troubleshooting in the nature of diagnosing problems with manufacturing equipment, control systems, humanoid robots, visioning systems, autonomous mobile robots, and automated guided vehicles; technical support services, namely, troubleshooting cybersecurity breaches; and technology audit services, namely, auditing manufacturing processes and systems for production process, equipment and maintenance, quality, defect-rate, supply chain, and inventory inefficiencies | ACTIVE | — |
| 045 | Analysis and consultation pertaining to job site safety; consultancy on regulations on safety at work; consultancy relating to workplace safety; consulting services in the field of food safety; and consulting services in the field of state and federal regulatory compliance requirements for personnel safety | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 13, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 25, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 25, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 19, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 31, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 31, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 31, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 31, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 31, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 29, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 29, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 29, 2026 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 13, 2026 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Apr 13, 2026 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Feb 4, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Feb 4, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 4, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 2, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 2, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 2, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 28, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Jul 28, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| May 1, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 30, 2025 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Apr 30, 2025 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Apr 11, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 10, 2025 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Apr 10, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 3, 2024 | NWAP | NEW APPLICATION ENTERED | — |