Drawing for PLEXAR

USPTO serial 98786749

PLEXAR

Reviewed by CopyMark Law Group

Reg. 7955146Status 700Registered
Filing date
Status date
Registration date
Sep 23, 2025
Examiner
DANG, BAO-NGOC K
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PLEXAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mary Frances Love

Mary Frances Love Muncy, Geissler, Olds & Lowe, P.C.125 S. Royal St.Alexandria, VA 22314United States

Goods and services

ClassDescriptionStatusFirst use
036Financing of microgrid solutionsACTIVE—
037Construction services, namely the construction of distributed energy systems and microgrid power systems; construction planning of energy microgrids and energy storage systems; installation of energy microgrids and energy storage systems; maintenance and repair of equipment for on-site energy generation for othersACTIVE—
040Production of electrical power through the operation of microgrids controlled via cloud-based network operations center; production of electrical power through the operation of energy microgrids and energy control management systemsACTIVE—
042Technical engineering, technical planning and consulting in the field of distributed energy systems and microgrid power systems, namely feasibility assessments, system engineering and design, project development, and monitoring, maintaining, managing, and optimizing energy systems and microgrid power systems; software as a service (SAAS) services featuring software for use in energy production, energy monitoring and energy management and for use in tracking energy usage; Providing temporary use of non-downloadable computer software for analyzing performance of renewable energy and microgrid storageACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 23, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 23, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 5, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 5, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 30, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 15, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 16, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 31, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 31, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 31, 2025ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
May 12, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
May 12, 2025GNSLLETTER OF SUSPENSION E-MAILED—
May 12, 2025CNSLSUSPENSION LETTER WRITTEN—
Apr 15, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 9, 2025DOCKASSIGNED TO EXAMINER—
Apr 8, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 3, 2025AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Apr 3, 2025PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Oct 5, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance