Drawing for AMRIZE

USPTO serial 98792004

AMRIZE

Reviewed by CopyMark Law Group

Status 732Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
LAPTER, ALAIN J
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 732: Status 732 means the third six-month extension to file a Statement of Use was granted. You are past the midpoint of available extension time — plan SOU filing carefully.

Need help with AMRIZE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,545*

Plus Government fees of $750

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lindy M. Herman

Lindy M. Herman Rutan & Tucker LLP18575 Jamboree Road, 9th FloorIrvine, CA 92612United States

Goods and services

ClassDescriptionStatusFirst use
001Adhesive materials for the building industry; Adhesives for use in industry; Chemicals for use in industry and science; Industrial adhesives; Industrial chemicals; Roofing adhesive; Unprocessed artificial resins; Unprocessed plasticsACTIVE—
017Adhesive caulking compounds; Adhesive sealant compounds; Building insulation materials; Caulking compounds; Caulking materials; Duct tapes; Foam insulation materials for use in building and construction; Insulating foam for use in building and construction; Insulating materials; Insulating materials for building; Insulating materials made of polyurethane foam; Insulating tapes; Insulating waterproofing membranes; Rubber sheets; Sealant compounds for joints; Soundproofing materials for building; Substances for insulating buildings against moistureACTIVE—
019Adhesive mortar for building purposes; Asbestos mortar; Asphalt; Asphalt roof coatings; Asphalt roofing felt; Bitumen; Bitumen-based sealants for roofing; Bituminous coatings for roofing; Bonding mortar for building purposes; Brackets, not of metal, for building; Building material, namely, plastic webbing material used to reinforce bituminous waterproofing sheets; Building materials, namely, cellular PVC trim; Building materials, namely, plastic pipe supports; Building materials, namely, pre-cast concrete wall forms; Building panels, not of metal; Cement; Cement aggregates; Cement mixes; Cement pipes; Cementitious material for building purposes; Cladding, not of metal, for building; Concrete; Concrete pipes; Drain pipes, not of metal; Facing mortar; Gravel; Gypsum for use as building materials; Lime building materials; Monuments of stone; Mortar for building; Mortar mix; Non-metal building materials, namely, soffits; Non-metal construction materials, namely, natural and artificial stones; Non-metal gutter pipes; Non-metal mantels for fireplaces; Nonmetallic construction materials, namely, drain bases and grates; Pipes of earthenware; Pitch; Plaster for building purposes; Portland blast-furnace slag cement; Portland cement; PVC roofing membrane; Ready to use concrete; Reinforcing materials not of metal for building purposes; Reinforcing materials, not of metal, for building; Rigid pipes, not of metal, for building; Roof coverings, not of metal; Roof gutters, not of metal; Roofing fabrics; Roofing felts; Roofing membranes; Slag stone; Slag-lime cement; Tar-based sealants for roofingACTIVE—
037Building construction services; Building damp-proofing; Building sealing and caulking services; Repair of buildings; Roofing installation; Roofing servicesACTIVE—
040Destruction of waste and trash; Environmental remediation services, namely, treatment of soil, waste and water; Hazardous waste treatment services; Incineration of waste and trash; Provision of information, advice and consultancy in relation to the production of energy, and the treatment, recycling, transformation and incineration of waste; Recycling of waste and trash; Waste processing; Waste treatment servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 15, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 14, 2026EX3GSOU EXTENSION 3 GRANTED—
Oct 14, 2026EXT3SOU EXTENSION 3 FILED—
Oct 14, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 16, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 15, 2026EX2GSOU EXTENSION 2 GRANTED—
Apr 15, 2026EXT2SOU EXTENSION 2 FILED—
Apr 15, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 21, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 20, 2025EX1GSOU EXTENSION 1 GRANTED—
Oct 20, 2025EXT1SOU EXTENSION 1 FILED—
Oct 20, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 2, 2025ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
May 22, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 22, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 22, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 22, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 4, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 4, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Feb 4, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 4, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 4, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 3, 2025DOCKASSIGNED TO EXAMINER—
Feb 3, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 9, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance