Drawing for TERAPRO

USPTO serial 98811427

TERAPRO

Reviewed by CopyMark Law Group

Status 730Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
BURCH, JILLIAN RENEE
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 730: Status 730 means you filed the first six-month extension to delay filing a Statement of Use after a Notice of Allowance. You must file a Statement of Use or another extension before the new deadline.

Need help with TERAPRO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew J. Hollander

Andrew J. Hollander K&L Gates LLPOne Newark Center, 10th FloorNewark, NJ 07102United States

Goods and services

ClassDescriptionStatusFirst use
002Protective waterproof coatings in the nature of exterior surface protective coatings for waterproofing masonry, wood, metal, concrete and cementitious substrates; protective waterproof coatings in the nature of exterior surface protective coatings for waterproofing vehicular and pedestrian traffic areas; elastomeric-based polyurea coatings used as protective waterproof coatings for waterproofing masonry, wood, metal, concrete and cementitious substrates; elastomeric-based polyurea coatings used as protective waterproof coatings for waterproofing vehicular and pedestrian traffic areas; elastomeric-based aliphatic polyurea coatings, used as protective waterproof coatings for waterproofing wood, metal, concrete and cementitious substrates; aliphatic polyurea elastomeric-based coating, used as a protective waterproof coatings for waterproofing vehicular and pedestrian traffic areas; epoxy primer for treating wood, metal, concrete, and cementitious substrates; epoxy-based primer for treating vehicular and pedestrian traffic areas; two-component coatings in the nature of exterior surface protective coatings for waterproofing masonry, wood, metal, concrete, and cementitious substrates, and for waterproofing vehicular and pedestrian traffic areas; two component epoxy-based primer for treating masonry, wood, metal, concrete, and cementitious substrates, and for vehicular and pedestrian traffic areasACTIVE—
017Polyurethane concrete and asphalt crack repair material being polyurethane sealants; polyurethane sealants; adhesive fabric tape for industrial use, particularly for covering joints and cracks in metal, wood, concrete, and cementitious substrates; two-component modified urethane concrete repair material in the nature of a sealant for concrete repair; two component polyurethane sealants for concrete and asphalt crack repair; two-component polyurethane sealantACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 29, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 28, 2026EX1GSOU EXTENSION 1 GRANTED—
Aug 28, 2026EXT1SOU EXTENSION 1 FILED—
Aug 28, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 3, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 6, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 6, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 31, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 7, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 3, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 3, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 3, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 1, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Aug 1, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
May 5, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2025DOCKASSIGNED TO EXAMINER—
Apr 21, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 12, 2025ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 21, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance