Drawing for HOOSIER SOLAR

USPTO serial 98869185

HOOSIER SOLAR

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
MACDOUGALL, KIERRA RYNNE
Law office
TMO LAW OFFICE 126

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with HOOSIER SOLAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Eric G. Wright

Eric G. Wright Wright IP & International Law PLLC1101 New Hampshire Ave., NWSuite 612Washington, DC 20037

Goods and services

ClassDescriptionStatusFirst use
004Electrical energyACTIVE—
007Renewable energy power generating facilities, namely, solar power electricity generating facilities; Utility services, namely, transmission of electricity from solar energy; Public utility services in the nature of electricity distribution from solar electricity generating facilities; Utility power services, namely, distribution of energy; Independent power producer services, namely, supplying electricity from solar electricity generating facilities; Independent power producer services, namely, supplying energy from solar electricity generating facilities; Independent power producer services, namely, supplying electrical power from solar electricity generating facilities; Energy service provider, namely, providing energy from solar electricity generating facilities; Utility power distribution, namely, providing power from solar electricity generating facilitiesACTIVE—
011Power plants, namely, solar power plants, solar electricity plants, solar energy plants, solar energy system power generating facilities being solar farms; Solar electricity generating facilities, namely solar electricity power plants; Solar electricity power generating facilities, namely solar electricity power plants; Solar electrical power generating facilities; Solar electricity plants, namely solar electricity power plantsACTIVE—
035Wholesale electricity provider services, namely, providing a service that allows customers to purchase energy, namely, electricity from renewable sources, namely, electricity from solar; Wholesale energy provider services that allow customers to purchase electricity as part of a competitive wholesale energy market; marketing services in the field of electricity in the wholesale market, namely, electricity from solarACTIVE—
036Financial investment in the field of real estate in qualified opportunity zones; Investment of funds in the fields of renewable energy and energy-related businesses; Brokerage of energy for others, namely, electricity from renewal sources generated through renewable energy, namely, solar; Real estate development and construction of solar energy-based electrical power plants, solar energy system facilities being solar farmsACTIVE—
039Utility services, namely, transmission of electricity from solar energy systems; Public utility services in the nature of electricity distribution from solar energy systems; Utility power services, namely, distribution of energy; Independent power producer services, namely, supplying electricity from solar energy systems; Independent power producer services, namely, supplying energy from solar energy systems; Independent power producer services, namely, supplying electrical power from solar energy systems; Independent power producer services, namely, supplying electricity across power lines; Energy service provider, namely, providing solar energy in nature of solar energy distribution services; Utility power distribution, namely, providing power from solar energy systemsACTIVE—
040Electricity production, namely production of electrical energy; Energy production; Power production, namely, production of electrical power from renewable sources being solar energy; Generation of electricity from renewable energy sources, namely, electricity from solar energy systems; Generation of power from renewable energy sources, namely, power from solar energy systems; Production of electrical power from renewable sources, namely, power from solar energy systems; Production and generation of renewable and clean energy, namely, clean energy from solar energy systems; Generation of utility-scale energy from renewable and clean energy sources, namely, energy from solar; Energy service provider, namely, electrical energy generation from solar energy systems, and utility power production being production of electrical power from renewable sources; Production of energy; Production of energy by solar energy system facilities being solar farms; Production of energy for domestic and industrial use from renewable sources, namely, energy from solar energy; Generation of electricity; Generation of electricity, namely by solar energy system facilities being solar farms; Generation of energy; Generation of power; Production of energy by power plants, namely, by solar energy system facilities being solar farms; Generation of electricity from solar energy; Generation of energy from solar energy; Generation of power from solar energy; Production of electrical power from renewable sources, namely, solar energy; Production of energy by power plants; Production of solar energy for others; Generation of electricity from solar energy for others; Generation of power through the operation of solar energy system facilities being solar farms; Generation of electricity from solar electricity generating facilities; Production of electricity from solar energy; Electricity production from solar farms, namely, generation of electricity from solar energyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Aug 12, 2026MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 12, 2026ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 15, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Apr 15, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jan 23, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 23, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 23, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 20, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 20, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 20, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 31, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Jul 31, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
May 21, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 16, 2025DOCKASSIGNED TO EXAMINER—
Apr 26, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 23, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance