USPTO serial 98889443
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael J. Leonard
Michael J. Leonard Fox Rothschild LLP212 Carnegie Center, Suite 400Princeton, NJ 08540United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of storage and moving apparatus and machines, namely, power jacks and mechanical and hydraulic lifts; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of open cast mining, port and yard machines, namely, bucket wheel and chain excavators, surface miners, mobile, semi-mobile and stationary crushing machines for industrial purposes and structural parts and components therefor; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of mobile transfer conveyors and belt wagons in the nature of open and closed belt conveyors and bucket belt conveyors; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of mechanical spreaders and cross pit mechanical spreaders; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of heap leach systems, namely, copper or other precious metal extraction machines, long distance belt conveyors, conveyor belts for open and closed belt conveyors, slope conveyor belts for open and closed belt conveyors; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of transport crawler track loaders, bucket chain continuous and grab type ship unloaders being cranes; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of ship loaders, namely, cranes for loading and unloading boats and ships, boom stacking machines; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of reclaiming machines for collecting bulk materials, namely, boom bucket wheel reclaimers, bridge type bucket wheel reclaimers, bridge and portal scraper reclaimers, barrel reclaimers, and combined bucket wheel stacker reclaimers; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of conveyors for ore, coal and other bulk materials, namely, tube chain conveyors, belt conveyors; Production lines, installations, and machinery for the iron and steel industry and for the metallurgical industry in the nature of train loading and unloading machines | ACTIVE | — |
| 009 | Electronic control systems for machines for controlling, moving and managing loose material at ports and steel plants and for controlling, moving and managing lines, installations and machinery doing said operations; electronic control systems for Open Cast Mining Equipment in the nature of electronic control systems for machines for controlling and managing steel plant materials | ACTIVE | — |
| 011 | Industrial furnaces and their parts; Industrial furnaces and their parts, namely, furnaces sold as a unit with electrical reactors; equipment for heating, heat-treatment, calcinating, smelting, cooking, curing, direct reduction of products and materials for the metallurgical industry, namely, industrial furnaces and their parts being carburizing furnaces and controlled atmosphere furnaces; Pressure vessels for decarbonization and their parts, namely, carburizing and decarburization furnaces; Equipment for atmospheric gas and parts thereof, namely, feed gas regulation systems for furnaces based on the measurement of exhaust gas comprised of regulating accessories for gas apparatus being pressure regulators for gas pipes and lines; Industrial furnaces and their parts being Electric Arc Furnaces for the treatment of post-steelwork residues; Industrial furnaces and their parts being pyrometallurgical plants in the nature of electric arc furnaces for the treatment of post-steelwork residues | ACTIVE | — |
| 042 | Industrial analysis and research services, namely, industrial research in the field of reduction of environmental impact and reduction of energy consumption; design and development of computer hardware and software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 17, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 17, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 30, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 30, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 24, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 3, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 3, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 2, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 2, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 3, 2025 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 3, 2025 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 3, 2025 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 1, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 1, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 1, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 5, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 5, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 5, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 27, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 27, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 17, 2025 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Jan 17, 2025 | ALIE | ASSIGNED TO LIE | — |
| Dec 22, 2024 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Dec 6, 2024 | NWAP | NEW APPLICATION ENTERED | — |