Drawing for CONNECTED BUILDINGS

USPTO serial 98913137

CONNECTED BUILDINGS

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
KNIGHT, TROY FRANK
Law office
TTAB

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 604: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with CONNECTED BUILDINGS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

CHRISTOPHER A. PROSKEY

CHRISTOPHER A. PROSKEY BROWNWINICK LAW FIRM666 GRAND AVENUE, SUITE 2000DES MOINES, IA 50309UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Advisory services relating to the installation of building automation equipment; Electrical Contractor Services; General construction contracting; Installation of building automation equipment; Installation of building power management equipment; Installation of building power monitoring equipment; Installation of building security and access equipment; Installation of communication and data equipment; Installation of fire safety and monitoring equipment; Installation of HVAC equipment; Installation of industrial automation equipment; Installation of information technology (IT) equipment; Installation of lighting control equipment; Installation of temperature control equipment; Installation of video surveillance equipment; Installation of visitor tracking equipment; Installation, Maintenance and Repair of Building Automation, Temperature Control, Security, Fire Alarm and Parking Control Systems; Installation of building monitoring equipment; Maintenance and repair of building automation equipment; Maintenance and repair of building monitoring equipment; Maintenance and repair of building power management equipment; Maintenance and repair of building power monitoring equipment; Maintenance and repair of building security and access equipment; Maintenance and repair of communication and data equipment; Maintenance and repair of fire safety and monitoring equipment; Maintenance and repair of HVAC equipment; Maintenance and repair of industrial automation equipment; Maintenance and repair of information technology (IT) equipment; Maintenance and repair of lighting control equipment; Maintenance and repair of temperature control equipment; Maintenance and repair of video surveillance equipment; Maintenance and repair of visitor tracking equipment; Mechanical contractor services, namely installing and servicing of mechanical, HVAC, building automation, security and fire alarm systems; Consulting services in the field of automation systems and controls, namely, office and workplace automation systems and controls; Consulting services in the field of automation equipment and systems, namely, office and workplace automation equipment and systems; Design of automation equipment and systems, namely, office and workplace automation equipment and systems; Custom design of automation equipment and systems, namely, office and workplace automation equipment and systemsABANDONED—
042Building design and planning services; Engineering services in the field of automation systems and controls; Consulting services in the field of design of automation systems and controls, namely, office and workplace automation systems and controls; Consulting services in the field of design of automation equipment and systems, namely, office and workplace automation equipment and systems; Design of automation equipment and systems, namely, office and workplace automation equipment and systems; Custom design of automation equipment and systems, namely, office and workplace automation equipment and systemsABANDONED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 18, 2026MAB4ABANDONMENT NOTICE E-MAILED - INTER PARTES DECISION—
Aug 18, 2026ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Aug 18, 2026OP.TOPPOSITION TERMINATED NO. 999999—
Aug 18, 2026OP.SOPPOSITION SUSTAINED NO. 999999—
Apr 5, 2026ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Apr 3, 2026OP.IOPPOSITION INSTITUTED NO. 999999—
Nov 6, 2025ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Oct 7, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 7, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 1, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 6, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 6, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Sep 6, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 6, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 6, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 14, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 18, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 5, 2025DOCKASSIGNED TO EXAMINER—
Dec 19, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance