USPTO serial 98913482
CARBONCUTTER
Reviewed by CopyMark Law Group
Status 730Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- CORDANI, CAITLIN A
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with CARBONCUTTER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,545*
Plus Government fees of $750
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patchen M. Haggerty
Patchen M. Haggerty Ashurst Perkins Coie US LLPP.O. Box 2608Seattle, WA 98111United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Concrete additives | ACTIVE | — |
| 019 | Concrete; ready to use concrete; concrete mix; cement; cement aggregates; non-metal construction materials, namely, concrete mixes with reduced Portland cement content; cementitious material for building purposes; supplementary cementitious materials for building purposes; non-metallic mineral mixes for building or construction; concrete building elements, namely, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, and concrete supports; precast concrete products, namely, concrete barriers, concrete retaining walls, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, concrete supports, concrete pre-fabricated architectural columns, concrete beams, concrete pipes, concrete pre-fabricated bridge structures, concrete pile caps, concrete wingwalls, concrete parking structures, concrete wall panels, concrete hollow core panels, concrete double tees beams, concrete stairs, voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, and concrete drainage structures being storm manholes, trench drains, vaults, catch basins, culverts, oil/water separators, interceptors, inlets, junction boxes, pipes, wells, and harvesters; prestressed concrete products, namely, concrete barriers, concrete retaining walls, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, concrete supports, concrete pre-fabricated architectural columns, concrete beams, concrete pipes, concrete pre-fabricated bridge structures, concrete pile caps, concrete wingwalls, concrete parking structures, concrete wall panels, concrete hollow core panels, concrete double tees beams, concrete stairs, voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, and concrete drainage structures being storm manholes, trench drains, vaults, catch basins, culverts, oil/water separators, interceptors, inlets, junction boxes, pipes, wells, and harvesters; precast concrete products and structures, namely, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, concrete supports, concrete pre-fabricated architectural columns, concrete beams, concrete pipes, concrete pre-fabricated bridge structures, voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, concrete pile caps, concrete wingwalls, concrete parking structures, concrete wall panels, concrete hollow core panels, concrete double tees beams, concrete stairs, and concrete drainage structures being storm manholes, trench drains, vaults, catch basins, culverts, oil/water separators, interceptors, inlets, junction boxes, pipes, wells, and harvesters; girders, not of metal; prestressed concrete products and structures, namely, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, concrete supports, concrete columns, concrete beams, concrete pipes, concrete bridge structures, concrete drainage structures being storm manholes, trench drains, vaults, catch basins, culverts, oil/water separators, interceptors, inlets, junction boxes, pipes, wells, and harvesters , voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, concrete pile caps, concrete wingwalls, concrete parking structures, concrete wall panels, concrete hollow core panels, concrete double tee beams, and concrete stairs | ACTIVE | — |
| 037 | Technical consultation in the field of building materials, namely, cementitious materials, low-carbon concrete, low-emission concrete, prestressed concrete, asphalt, low-emission asphalt, and aggregates; building construction advisory services; building construction advisory services in the field of construction, construction materials, and carbon footprint management; construction consulting in the field of sustainable construction materials | ACTIVE | — |
| 040 | Custom manufacture of precast and prestressed concrete; custom manufacture of low-carbon precast and prestressed concrete; manufacturing precast and prestressed concrete products to the order and specification of others; manufacturing services for others in the field of architectural, structural, and industrial precast concrete products; provision of low-carbon asphalt and ready-mix concrete being manufacturing of low-carbon asphalt and ready-mix concrete to custom specifications and order of others; custom fabrication and production of low-carbon building materials for infrastructure and environmental construction applications; consulting in the field of manufacture of sustainable construction materials | ACTIVE | — |
| 042 | Design and engineering services in the field of sustainable construction materials | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by KNIFE RIVER CORPORATION
- Other trademarks owned by KNIFE RIVER CORPORATION
- Other trademarks in Class 001
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named CARBONCUTTER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 30, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 29, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 29, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 29, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 31, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 3, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 3, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 28, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 6, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 9, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 9, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 9, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 5, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Sep 5, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Jun 9, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 27, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 19, 2024 | NWAP | NEW APPLICATION ENTERED | — |