Drawing for SWIFTSTRUCTURES

USPTO serial 98913485

SWIFTSTRUCTURES

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
CORDANI, CAITLIN A
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with SWIFTSTRUCTURES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

PATCHEN M HAGGERTY

PATCHEN M HAGGERTY PERKINS COIE LLPPO BOX 2608SEATTLE, WA 98111UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011Precast concrete products, namely, septic tanksACTIVE—
019Concrete; ready to use concrete; concrete mix; cement; cement aggregates; non-metal construction materials, namely, concrete mixes with reduced portland cement content; cementitious material for building purposes; supplementary cementitious materials for building purposes; non-metallic mineral mixes for building or construction; concrete building elements, namely, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete slabs, concrete panels, concrete bracing, and concrete supports; precast concrete products, namely, precast concrete pipes, manholes, catch basins and inlets, box culverts, headwalls and wing walls, utility vaults, stormwater treatment units comprised of water storage basins for storing and collecting stormwater, stormwater treatment units comprised of oil water separator vaults, stormwater treatment units comprised of stormwater detention vaults, stormwater treatment units comprised of stormwater infiltration chambers, stormwater treatment units comprised of hydrodynamic separator structures, precast drainage trenches and channels, retaining walls, sound barriers and noise walls, bridge components being precast non-metal bridge deck panels, prestressed concrete bridge girders, precast concrete parapets, precast concrete approach slabs and non-metal concrete railings for bridges, barrier systems comprised of concrete vehicle barriers for parking areas, barrier systems comprised of traffic control barriers, barrier systems comprised of security perimeter barrier walls, barrier systems comprised of concrete crash barriers, barrier systems comprised of concrete pedestrian protection barriers, building panels, stair systems comprised of precast concrete stair flights, stair systems comprised of precast concrete landings, stair systems comprised of stair riser and tread assemblies, stair systems comprised of structural concrete stair modules, precast foundations, precast slabs, grease interceptors, precast prefabricated architectural and structural columns and beams, precast prefabricated modular buildings and shelters, parking structure components being concrete barriers for car parking facilities, concrete spandrel panels, concrete guardrails and concrete gates for parking facilities; prestressed concrete products namely bridge girders, floor and roof systems comprised of hollow-core concrete slabs, floor and roof systems comprised of double-tee concrete beams, floor and roof systems comprised of prestressed concrete floor planks, floor and roof systems comprised of precast concrete roof deck panels, wall panels, beams and prefabricated architectural and structural columns, parking structure components being concrete barriers for car parking facilities, concrete gates for parking facilities and structural parking deck panels, bridge deck panels, railroad and transit components being concrete railroad ties and sleepers, precast concrete track slabs, transit platform panels and precast concrete guideway components being concrete beams and deck slabs, marine and coastal products being precast concrete seawalls, precast concrete bulkheads, coastal erosion control units, marine piling caps and breakwater concrete armor units, stadium and arena components being precast concrete seating risers, stadium stair and ramp systems, precast concourse slabs and structural concrete support beams and columns, utility and industrial products being precast concrete utility vaults, electrical transformer pads, equipment support pedestals, industrial containment structures and machine foundations; precast concrete products and structures, namely, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete panels, concrete bracing, concrete supports, concrete pre-fabricated architectural and structural columns, concrete beams, concrete pipes, concrete prefabricated bridge structures, concrete drainage structures being manholes, catch basins and inlets, box culverts, pipe systems comprised of concrete pipes, pipe systems comprised of reinforced concrete pipe (RCP), pipe systems comprised of precast concrete storm sewer pipes, stormwater treatment units comprised of water storage basins for storing and collecting stormwater, stormwater detention tanks and water quality treatment vaults, utility vaults and chambers, retaining and wing walls, headwalls and endwalls, drainage channels and trenches, voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, concrete pile caps, concrete wingwalls, concrete prefabricated parking structures, concrete wall panels, concrete hollow core panels, concrete double tees beams, and concrete stairs; girders, not of metal; prestressed concrete products and structures, namely, concrete slabs, concrete walls, non-metal water storage basins for storing and collecting water, concrete posts, concrete bricks, concrete blocks, concrete panels, concrete bracing, concrete supports, concrete pre-fabricated architectural and structural columns, concrete beams, concrete pipes, concrete pre-fabricated bridge structures, concrete drainage structures being manholes, catch basins and inlets, box culverts, pipe systems comprised of concrete pipes, pipe systems comprised of prestressed concrete pressure pipe, pipe systems comprised of drainage pipe made of concrete, stormwater treatment units comprised of water storage basins for storing and collecting stormwater, stormwater detention tanks and water quality treatment vaults, utility vaults and chambers, retaining and wing walls, headwalls and endwalls, drainage channels and trenches, voided concrete slabs, concrete girders, concrete abutments, concrete bent caps, concrete pile caps, concrete wingwalls, concrete pre-fabricated parking structures, concrete wall panels, concrete hollow core panels, concrete double tees beams, and concrete stairsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Jul 7, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 12, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 12, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 13, 2026EXPTEXPARTE APPEAL TERMINATED—
Apr 13, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 9, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 9, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 9, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 9, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 17, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 17, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 17, 2026ALIEASSIGNED TO LIE—
Mar 13, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 13, 2026EXPIEX PARTE APPEAL-INSTITUTED—
Mar 13, 2026JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Mar 13, 2026EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Dec 23, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Dec 23, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Sep 26, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 26, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 26, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 28, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 27, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 27, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 10, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 10, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 10, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 6, 2025DOCKASSIGNED TO EXAMINER—
Apr 28, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance