USPTO serial 98923363
Reviewed by CopyMark Law Group
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $300
Feldkirch, AT
Feldkirch, AT
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Catherine F. Hoffman
Catherine F. Hoffman Baker, Donelson, Bearman, Caldwell & Berkowitz, PC200 East Broward Blvd, Suite 2000Ft. Lauderdale, FL 33301United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Industrial automation controls; industrial condition monitoring systems for machines and installations, namely, data acquisition units being computer hardware, with interfaces for connecting vibration sensors and rotational speed sensors and external signals, designed for installation in control cabinets, and featuring data interfaces for remote access and transmission of measurement data; electrical measuring and protection systems composed of some combination of temperature sensors, electric sensors, vibration sensors, optical sensors, acceleration sensors, inductive sensors, electrical controllers, central processing units (CPU), and semiconductor devices, the foregoing for power supply networks and technical power engineering installations; electrical measuring and protection systems comprised primarily of integrated electronics piezo-electric (IEPE) sensors, electrical controlling devices, central processing units (CPU), and semiconductor devices, the foregoing for power supply networks and technical power engineering installations; electrical control systems composed of some combination of temperature sensors, electric sensors, vibration sensors, optical sensors, acceleration sensors, inductive sensors, electrical controllers, central processing units (CPU), and semiconductor devices, the foregoing for power generation installations and power supply networks; electrical control systems comprised primarily of integrated electronics piezo-electric (IEPE) sensors, electrical controlling devices, electrical controllers, central processing units (CPU), and semiconductor devices, the foregoing for power generation installations and power supply networks; terminals in the nature of computer display screens for the visualization of machine controls; visualization systems comprised of computer display screens; utility grid power supplies for the power supply of control systems; digital and optical bus fiber connectors for the networking of servo systems and drives for machines and installations; diagnostic and monitoring units composed of some combination of temperature sensors, electric sensors, vibration sensors, optical sensors, acceleration sensors, inductive sensors, electrical controllers, central processing units (CPU), and semiconductor devices, with visual display on a screen for the input and process control of controls for machines and installations; diagnostic and monitoring units comprised primarily of integrated electronics piezo-electric (IEPE) sensors, electrical controlling devices, central processing units (CPU), and semiconductor devices, with a visual electronic display screen, for the input and process control of controls for machines and installations; electronic and optical communication links for connecting machines, installations and controls, namely, optical data links; electronic and optical communication links for connecting machines, installations and controls, namely, conducting data links being communication transmission apparatus; downloadable software for creating executable sequence programs for machines and installations; downloadable software for industrial automation systems, namely, downloadable software for direct and remote system and measurement configuration, acquisition of sensor and external signals, and controlling the transfer of measurement data to an external data server; downloadable software for industrial condition monitoring of machines and installations; downloadable software for measuring and protecting power supply networks and technical power engineering installations; downloadable software for regulating power generation installations and power supply networks; downloadable visualization software, namely, downloadable software for operating digital display screens for visualizing industrial and automated processes; downloadable cloud-based visualization software for operating digital display screens for visualizing industrial and automated processes | ACTIVE | — |
| 042 | Development of industrial automation controllers, industrial condition monitoring systems for machines and installations, electrical measuring and protection systems for power supply networks and technical power engineering installations, and electrical control systems for power generation installations and power supply networks; development of terminals for the visualization of machine controllers; development of visualization systems; development of utility grid power supply units for the power supply of control systems; development of digital and optical bus connections for the networking of servo systems and drives for machines and installations; development of diagnostic and monitoring units with visual display on a screen for the input and process control of controls for machines and installations; development of electronic and optical communication links for the connection of machines and installations and controllers; development of software for the creation of sequence programs for machines and installations; development of software for industrial automation systems, namely, software for direct and remote system and measurement configuration, acquisition of sensor and external signals, and controlling the transfer of measurement data to an external data server; development of software for industrial condition monitoring of machines and installations; development of software for measuring and protecting power supply networks and technical power engineering installations; providing temporary use of online non-downloadable software for regulating power generation installations and power supply networks; development of visualization software; providing temporary use of online non-downloadable software for creating executable sequence programs for machines and installations; providing temporary use of online non-downloadable software for industrial automation systems, namely, providing temporary use of online non-downloadable software for controlling and tracking problems of industrial automation installations; providing temporary use of online non-downloadable software for industrial condition monitoring of machines and installations; providing temporary use of online non-downloadable software for measuring and protecting power supply networks and technical power engineering installations; providing temporary use of non-downloadable cloud-based visualization software, namely, online non-downloadable software for operating digital display screens for visualizing industrial and automated processes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 28, 2026 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Apr 28, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 3, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 3, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 25, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 5, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 4, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 4, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 4, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 5, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 5, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 5, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 12, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 11, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 11, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 12, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 10, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 28, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 26, 2024 | NWAP | NEW APPLICATION ENTERED | — |