USPTO serial 98929118
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Powerway Renewable Energy Co., Ltd
Foshan, Guangdong, CN
Other trademarks owned by Powerway Renewable Energy Co., Ltd
Powerway Renewable Energy Co., Ltd
Foshan, Guangdong, CN
Other trademarks owned by Powerway Renewable Energy Co., Ltd
Powerway Renewable Energy Co., Ltd
Foshan, Guangdong, CN
Other trademarks owned by Powerway Renewable Energy Co., Ltd
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alex Patel
Alex Patel Patel IP, P.C.20700 Ventura Blvd., Suite 235Woodland Hills, CA 91364United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | mounting frames of metal for solar panels; gratings of metal; latticework of metal; building boards of metal; balustrades of metal; fences of metal; crash barriers of metal; bars for metal railings; pillars of metal for building; frames of metal for building; brackets of metal for building; pipe fittings of metal for building; roof flashing of metal; stair treads of metal; beams of metal; joists of metal; steel frames for building; metal fasteners for scaffolds; rails of metal | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 2, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 2, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 14, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 14, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 8, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 12, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 12, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 11, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 11, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 18, 2025 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 18, 2025 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 18, 2025 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 12, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 3, 2025 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 3, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 30, 2024 | NWAP | NEW APPLICATION ENTERED | — |