USPTO serial 98929655
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Elias Hantula
492 WoodRidge AveWoodRidge, NJ 07075United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Batteries; Transformers; Battery chargers; Battery chargers for use with vehicle batteries, mobile phones; laptops; computers; Charging stations for electric vehicles; Computer keyboard controllers; Converters, electric; Downloadable computer software for monitoring power supply, electricity management solution, battery level monitoring and power management solution; Downloadable software in the nature of a mobile application for monitoring power supply, electricity management solution, battery level monitoring, power management solution; Electric car charging piles; Electric power converters; Portable power chargers; Power cables; Power controllers; Solar cells; Solar panels for production of electricity; Voltage regulators; Accumulators | ACTIVE | Jan 6, 2025 |
| 037 | Installation, maintenance and repair of computer hardware; Installation, maintenance and repair of solar installations for generating power; Cable laying; Charging of electric vehicles; Charging station services for electric vehicles; Custom installation of exterior, interior and mechanical parts of vehicles; Electrical contractor services; Information technology consultancy relating to installation, maintenance and repair of computer hardware; Machinery installation, maintenance and repair; Rental of battery chargers for electric motor scooters; Vehicle battery charging; Vehicle service stations | ACTIVE | Jan 6, 2025 |
| 042 | Architectural design in the field of energy use facilities; Computer services, namely, integration of private and public cloud computing environments; Consultation services relating to computer software; Consulting services in the field of architectural design; Engineering services in the field of electrical power and natural gas production; Engineering services, namely, engineering for the technical project planning; Providing scientific information, advice and consultancy relating to carbon offsetting; Providing scientific information, advice and consultancy relating to net zero emissions; Research and development services in the field of engineering; Software as a service (SAAS) services featuring software for monitoring power supply, electricity management solution, battery level monitoring, power management solution; Software as a service (SAAS) services featuring software using artificial intelligence (AI) for monitoring power suppl, electricity management solution, battery level monitoring, power management solution; Technical consulting in the field of environmental engineering; Technological consultation in the technology field of Environmental engineering technical product design; Technological research in the field of monitoring power supply, electricity management solution, battery level monitoring, power management solution, renewable energy resources; Technological planning and consulting services in the field of light engineering; Technology consultation in the field of conservation of energy; Technology consultation in the field of computer data processing; Consulting in the field of engineering; Design and development of computer hardware; Research and development of new products for others; Research in the field of artificial intelligence technology | ACTIVE | Jan 6, 2025 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 4, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 4, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 11, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 11, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 30, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 13, 2026 | IUAF | USE AMENDMENT FILED | — |
| Apr 13, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Oct 14, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 19, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 19, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 13, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 15, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 9, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 8, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 2, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 31, 2024 | NWAP | NEW APPLICATION ENTERED | — |