Drawing for GIGAGRID

USPTO serial 98945203

GIGAGRID

Reviewed by CopyMark Law Group

Status 731Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
HWANG, JOHN C B
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 731: Status 731 means the second six-month extension to file a Statement of Use was granted. File a Statement of Use or the next extension before the deadline expires.

Need help with GIGAGRID?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,545*

Plus Government fees of $750

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Caroline E. Bryce

Caroline E. Bryce Sheridan Ross. P.C.1560 Broadway, Suite 1200Denver, CO 80202United States

Goods and services

ClassDescriptionStatusFirst use
009Computer hardware and recorded software system for remotely monitoring, metering and managing of electrical systems and power grid energy usage; Computer hardware and recorded and downloadable computer software for remote management, automation, control and optimization of energy usage by electricity powered centralized facility and building systems; Energy resource management system comprised of recorded computer software and computer hardware for controlling and monitoring centralized facility and building infrastructure systems that use electricity, namely, security, access, heating, cooling, ventilation, lighting, elevators and escalators, safety alarms, water pumps, boilers, intercoms, telephone and computer systems, sprinklers; Energy resource management system comprised of recorded computer software and computer hardware, power generating and energy storage modules, smart sensors, routers, batteries, inverters, meters, wireless communication devices, namely, access points, routers, gateways, 5G wireless radio equipment, electrical control devices and distributed energy resources (DERS), namely, solar panels, wind turbines, battery storage, electric vehicle chargers, microgrids and demand response devices for the purpose of monitoring, metering and controlling energy loads in electrical systems and power grids; Electrical power distribution machines and boxes; Hybrid renewable energy system that stores, distributes, manages, and integrates with the grid, electricity created from two or more renewable energy technologies; Hybrid renewable energy system comprised of computer hardware and recorded computer software, energy storage modules, power converters and inverters, uninterruptable power supply (UPS), back-up power supply, switches, relays, transformers, circuit breakers and surge protectors, fuses, meters, micro-grids, power distribution units, voltage regulators and communication interfaces; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers for hybrid renewable energy installations;ACTIVE—
035Energy usage management services; Distributed energy resource management services, namely, providing a service that allows for management, operation and integration of distributed energy resources (DERs) with electrical systems and utility connected power grids to optimize balance and stability of energy supply; Energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity and renewable energy, at a fixed price; Energy management services, namely, providing a service that allows customers to purchase energy from various energy providers; Energy management information services; Renewable energy dispatch management services, namely, managing and coordinating the operation of electrical grids by choosing what renewable power sources to use and how much power to produce at any given time to match electricity demands; Energy dispatch management services, namely, scheduling, managing and optimizing energy generation, distribution and allocation based on demands, anticipated energy market pricing and capacity;ACTIVE—
039Utility services, namely electricity power grid load shifting; Distribution and transmission of electricity; Distribution of energy; Distribution of renewable energy; Physical storage of electrical power; Leasing of renewable energy generation equipment; Leasing of energy generating equipment;ACTIVE—
040Generation of power through operation of power generation equipment and facilities; Generation of electricity; Generation of renewable energy; Generation of energy; Generation of zero-emissions electricity;ACTIVE—
042Platform as a service (PAAS) services featuring power creation and storage modules and integrated computer hardware and software platform for metering, managing and optimizing of electrical systems, and central and distributed and renewable energy resources; Platform as a service (PAAS) services, namely, energy resource management system comprised of power generating and energy storage modules, solar panels, smart sensors, routers, batteries, inverters, meters, wireless communication devices, namely, access points, routers, gateways, 5G wireless radio equipment, electrical control devices and non-downloadable software for generating and storing power that can be used as a local microgrid to offset high power demands made of a distributed energy resources or for injection or integration as needed with centrally connected energy resources for optimizing stability and demand of energy sources; Platform as a service (PAAS) services featuring combined hardware and software platform for energy distribution and energy asset distribution management; Infrastructure as a service (IAAS) services, namely, providing distributed and renewable energy resources and a connected distributed energy resource management platform for others to help control, manage, optimize and stabilize an existing energy resource network; Platform as a service (PAAS) services featuring technology for creating and storing energy for purposes of connecting to distributed and central energy resources; Design and development of computer software and software applications for use in monitoring and controlling electricity generation, energy storage, electrical loads and other controllable energy assets, devices and equipment; Platform as a service (PAAS) services featuring computer software platforms for the control, monitoring, and management of distributed energy resources and any other device that may act as a load or generator on the electric grid; Platform as a service (PAAS) services featuring combined hardware and software platform for management of energy resources used to power centralized facility and building infrastructure; Development and implementation of energy trading arbitrage; Software, hardware and technology solutions for controlling and metering loads on electrical systems and active power grids; Platform as a service (PAAS) services featuring technology that interfaces with utility grid and other customer energy equipment and infrastructure for buying, selling and managing energy commodities; Providing temporary use of non-downloadable web-based decentralized applications (DApps) for trading energy commodities and energy commodity arbitrage;ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 21, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 20, 2026EX2GSOU EXTENSION 2 GRANTED—
Aug 20, 2026EXT2SOU EXTENSION 2 FILED—
Aug 20, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 11, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 10, 2026EX1GSOU EXTENSION 1 GRANTED—
Feb 10, 2026EXT1SOU EXTENSION 1 FILED—
Feb 10, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 23, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 29, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 29, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 23, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 24, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 17, 2025DOCKASSIGNED TO EXAMINER—
Apr 29, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 6, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 6, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 6, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 8, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance