USPTO serial 98947403
BELTWAYS
Reviewed by CopyMark Law Group
Status 730Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- LE, KIEU-NHI NGOC
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with BELTWAYS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*
Plus Government fees of $450
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Hebron, KY, US
Hebron, KY, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Rebecca Dalton
Rebecca Dalton Covington & Burling LLPOne CityCenter, 850 Tenth Street NWWashington, DC 20001United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Moving walkways, accelerating moving walkways, and moving platforms for transporting individuals and components, accessories, and parts therefor; Conveying system equipment and conveying installations designed for transporting individuals, namely, belt conveyors, belts for conveyors, conveyors being machines, moving sidewalks, moving pavement, and escalators | ACTIVE | — |
| 037 | construction consultation with regard to building conveying system equipment and conveying installations for transporting individuals; installation, servicing, maintenance, repair, rebuilding, reconditioning, retrofitting, renovation, refurbishment, and modernization services for components and parts of conveying system equipment and conveying installations for transporting individuals; Installation, servicing, maintenance, repair, rebuilding, reconditioning, retrofitting, renovation, refurbishment, and modernization services for conveying system equipment and conveying installations for transporting individuals; installation, servicing, maintenance, repair, rebuilding, reconditioning, retrofitting, renovation, refurbishment, and modernization of moving walkways, accelerating walkways, and moving platforms for transporting individuals and components, accessories, and parts therefor; building, construction, installation, and assembly of conveying system equipment and conveying installations for transporting individuals | ACTIVE | — |
| 042 | Platform as a service (PAAS) featuring computer software platforms for monitoring and operation of moving walkways, accelerating walkways, and moving platforms for transporting individuals and for recording, analyzing, and processing traffic and performance data for increasing performance of moving walkways, accelerating walkways, and moving platforms for transporting individuals; monitoring and inspection for quality control purposes of moving walkways, accelerating walkways, and moving platforms; Consultancy in the field of design and development of new products being moving walkways, accelerating walkways, and moving platforms for transporting individuals; Software as a service (SAAS) featuring computer software for monitoring and operation of moving walkways, accelerating walkways, and moving platforms for transporting individuals and for recording, analyzing, and processing traffic and performance data for increasing performance of moving walkways, accelerating walkways, and moving platforms for transporting individuals; technical support services, namely, troubleshooting in the nature of diagnosing performance problems with computer hardware and software and electronic equipment of moving walkways, accelerating walkways, and moving platforms for transporting individuals and components, accessories, and parts therefor; engineering services in connection with conveying system equipment and conveying installations for transporting individuals, namely, planning and designing of conveying system equipment and conveying installations; surveying in connection with conveying system equipment and conveying installations for transporting individuals; Providing temporary use of online, non-downloadable software to record, analyze, and process traffic and performance data for increasing performance of moving walkways, accelerating walkways, and moving platforms for transporting individuals; quality control, quality evaluation and analysis for others relating to components and parts for conveying system equipment and conveying installations for transporting individuals; Consultancy in the field of product design and development of conveying system equipment and conveying installations for transporting individuals; quality control, quality evaluation and analysis for others relating to conveying system equipment and conveying installations for transporting individuals; Technical development of new technology for others in the field of technical building facilities, namely, hydraulically, pneumatically, electrically and machine operated moving walkways, accelerating walkways, and moving platforms for transporting individuals and components, accessories, and parts therefor; technical research and product design of moving walkways, accelerating walkways, and moving platforms | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 13, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 13, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 13, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 5, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 14, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 17, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 17, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 11, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 22, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 17, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 17, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 17, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Sep 19, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Jun 26, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 18, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 30, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 9, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 9, 2025 | NWAP | NEW APPLICATION ENTERED | — |