Drawing for V&S

USPTO serial 99006328

V&S

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
THOMAS, JULIE
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with V&S?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,095*

Plus Government fees of $625

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew P. Dugan

Matthew P. Dugan DUGAN LAW OFFICE, LLC19111 Detroit Road, Suite 205Rocky River, OH 44116United States

Goods and services

ClassDescriptionStatusFirst use
006Pre-fabricated and custom engineered metal structures, namely, simple span bridges, A-frames, H-frames, switch stands, bus stands, transformer platforms, grounding mats, and CCTV stands for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for construction of high-voltage electrical sub-stations and electrical power distribution networks; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered metal structures, namely, metal posts, metal beams, metal tubes, metal pipes, and preformed lengths of metal, namely, beams, tubing, angle, channel, guard rail, and formed-plate shell halves; Pre-fabricated metal platforms; Ladder supports of metal; Pre-fabricated and custom engineered structural steelwork, namely, steel frames, steel sub-frames, and preformed frame members for use in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Flooring of metal; Stairs and railings of metal for use in structures of transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for use in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Poles of metal; Gratings of metal; Metal laddersACTIVE—
009High voltage electrical transmission and telecommunications masts, towers and support structures thereof; Support structures, masts and towers, namely, static masts, lighting masts, and cellular communications towers for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Electrical power distribution and transmission devices, namely, electrical bus bars for high-voltage electrical transmission and distribution utilitiesACTIVE—
039Warehousing services, namely, storage, staging and packing for transportation of parts of metal, transformers, insulators, corona rings, armor-rods, surge arresters, circuit breakers, circuit switchers, voltage regulators, fuses, capacitors, relays, rectifiers, electric power converters for use in construction of high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Warehousing services, namely, storage, staging and packing for transportation of parts of metal for use in construction of highways, roadways, railways, and bridgesACTIVE—
040Custom fabrication and manufacture of structural parts of metal for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure in the nature of metal structures and metal hardware used in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilitiesACTIVE—
042Engineering and design services, namely, engineering and design services in connection with parts, components, structures and sub-structures for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
May 12, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 17, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 17, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 24, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 27, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 27, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 27, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 23, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Sep 23, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jun 28, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 28, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 28, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2025DOCKASSIGNED TO EXAMINER—
Jun 20, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 17, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 17, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance