USPTO serial 99006328
V&S
Reviewed by CopyMark Law Group
Status 688Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- THOMAS, JULIE
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with V&S?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,095*
Plus Government fees of $625
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew P. Dugan
Matthew P. Dugan DUGAN LAW OFFICE, LLC19111 Detroit Road, Suite 205Rocky River, OH 44116United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pre-fabricated and custom engineered metal structures, namely, simple span bridges, A-frames, H-frames, switch stands, bus stands, transformer platforms, grounding mats, and CCTV stands for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for construction of high-voltage electrical sub-stations and electrical power distribution networks; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered metal structures, namely, metal posts, metal beams, metal tubes, metal pipes, and preformed lengths of metal, namely, beams, tubing, angle, channel, guard rail, and formed-plate shell halves; Pre-fabricated metal platforms; Ladder supports of metal; Pre-fabricated and custom engineered structural steelwork, namely, steel frames, steel sub-frames, and preformed frame members for use in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Flooring of metal; Stairs and railings of metal for use in structures of transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Pre-fabricated and custom engineered structural parts of metal, namely, beams, tubing, angle, channel, lateral braces, gussets, plates, guard rail, and formed-plate shell halves for use in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Poles of metal; Gratings of metal; Metal ladders | ACTIVE | — |
| 009 | High voltage electrical transmission and telecommunications masts, towers and support structures thereof; Support structures, masts and towers, namely, static masts, lighting masts, and cellular communications towers for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure; Electrical power distribution and transmission devices, namely, electrical bus bars for high-voltage electrical transmission and distribution utilities | ACTIVE | — |
| 039 | Warehousing services, namely, storage, staging and packing for transportation of parts of metal, transformers, insulators, corona rings, armor-rods, surge arresters, circuit breakers, circuit switchers, voltage regulators, fuses, capacitors, relays, rectifiers, electric power converters for use in construction of high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities; Warehousing services, namely, storage, staging and packing for transportation of parts of metal for use in construction of highways, roadways, railways, and bridges | ACTIVE | — |
| 040 | Custom fabrication and manufacture of structural parts of metal for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure in the nature of metal structures and metal hardware used in construction of highways, roadways, railways, bridges, high-voltage electrical transmission and distribution utilities, telecommunications utilities, and electrical power generation utilities | ACTIVE | — |
| 042 | Engineering and design services, namely, engineering and design services in connection with parts, components, structures and sub-structures for use in transportation infrastructure, energy utilities infrastructure and telecommunications infrastructure | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by V&S Schuler Engineering, Inc.
- Other trademarks owned by V&S Schuler Engineering, Inc.
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named V&S
- Prosecution event NOAM explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 12, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 17, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 17, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 11, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 24, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 27, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 27, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 27, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 23, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Sep 23, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Jun 28, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 28, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 28, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 20, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 17, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 17, 2025 | NWAP | NEW APPLICATION ENTERED | — |