Drawing for MPBS

USPTO serial 99006793

MPBS

Reviewed by CopyMark Law Group

Reg. 8218282Status 700Registered
Filing date
Status date
Registration date
Apr 21, 2026
Examiner
ALESKOW, DAVID HOWARD
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MPBS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Casey E. Wright

Casey E. Wright Barnes & Thornburg LLP11 South Meridian StreetIndianapolis, IN 46204United States

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials; metal scaffolding; scaffolding apparatus; scaffolding apparatus, namely metal framework tables, materials of metal for scaffolds; portable metal scaffolding structures; metal scaffold towers; metal scaffolding access platforms; metal scaffold structures anchoring devices; metal scaffolding working platforms; beams of common metal for scaffolding; beams of metal for use with scaffolding; ladders made of metal; articles of metal for use in construction, namely, metal hardware in the nature of shores, supports, braces, base plates, rollers, rails, pins, clips, fabricated metal components for building foundations, metal partitions, metal brackets; braces of metal for handling loads; elevated heights safety frames, namely, metal scaffolding; safety equipment for use during building construction and maintenance operations, namely, metal safety gates, metal ladders, metal turnbuckles, safety braces made of metal; parts and fittings for all the aforesaid goods, namely, metal joinery fittings, ring-shaped fittings of metal; concrete shoring frameworks, boiler maintenance scaffolds; manual material lifting devices, namely, gin wheels, davit arms; storage pallets, namely, metal cages, metal inserts; metal accessoriesACTIVE—
037Scaffolding rental, installation, repair, dismantlement; management and consultation for scaffolding planning; construction project management services in the field of scaffolding; rental of building scaffolds, working and building platformsACTIVE—
042Scaffolding design and scaffolding engineering services; product development and engineering services for others; product development and consulting in the field of scaffoldingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 21, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 21, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 3, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 3, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 25, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 6, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 5, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 5, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 5, 2026ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Nov 26, 2025GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Nov 26, 2025GNSIINQUIRY TO SUSPENSION E-MAILED—
Nov 26, 2025CNSISUSPENSION INQUIRY WRITTEN—
Jun 27, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 27, 2025GNSLLETTER OF SUSPENSION E-MAILED—
Jun 27, 2025CNSLSUSPENSION LETTER WRITTEN—
Jun 27, 2025DOCKASSIGNED TO EXAMINER—
Jun 20, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 17, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance