Drawing for EDMI

USPTO serial 99072668

EDMI

Reviewed by CopyMark Law Group

Status 730Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
MEIER, SHARON A
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 730: Status 730 means you filed the first six-month extension to delay filing a Statement of Use after a Notice of Allowance. You must file a Statement of Use or another extension before the new deadline.

Need help with EDMI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $498*

Plus Government fees of $250

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

CHRISTINE B. REDFIELD

CHRISTINE B. REDFIELD REDFIELD IP PC50 Woodside Plaza, No. 107Redwood City, CA 94061United States

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Electric power distribution machines; Electric meters; electrical energy utilization metering devices; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, remote metering systems, energy and utility systems; apparatus and instruments to measure, monitor, log, control and manage demand, capacity and reserves of electricity and power, namely, smart meters; Electricity meters; Meters for measuring electrical resistance; Meters for measuring electrical voltage; Meters for measuring values of electrical parameters; Downloadable electronic publications in the nature of newsletters, white papers, books, magazines, and brochures in the field of smart metering devices and solutions; Electronic devices and meters for measuring electric currentACTIVE—
042Software as a service [SAAS] services featuring software for electricity, natural gas, and water metering solutions; Software as a service [SaaS] services featuring software for monitoring electric equipment; Design and development of computer software applications for electricity, natural gas, and water metering solutions; Design and development of computer software application solutions for electric meters; Design and development of computer software application solutions for monitoring electric equipmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (EEXT): The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.

DateCodeEventWhat it means
Sep 16, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 13, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 13, 2026EX1GSOU EXTENSION 1 GRANTED—
Apr 12, 2026EXT1SOU EXTENSION 1 FILED—
Apr 12, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 4, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 9, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 9, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 3, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 9, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 8, 2025DOCKASSIGNED TO EXAMINER—
Jul 28, 2025MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 28, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 7, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 7, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance