Drawing for ROKSTAD

USPTO serial 99119939

ROKSTAD

Reviewed by CopyMark Law Group

Status 681
Filing date
Status date
Registration date
—
Examiner
LUEKEN, ABIGAIL JOSEPHINE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ROKSTAD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mammen P. Zachariah, Jr.

Mammen P. Zachariah, Jr. Greenberg Traurig, LLP777 South Flagler Drive, Suite 300 EastWest Palm Beach, FL 33401United States

Goods and services

ClassDescriptionStatusFirst use
037Installation, maintenance, and repair of electrical infrastructure systems hardware, electrical transmission and distribution systems hardware, lattice steel towers, wood poles, steel poles, and composite poles for high voltage electrical transmission lines and structures; Installation and stringing of single and bundled conductors for electrical transmission systems; Installation, maintenance, and repair of conductors for electrical distribution systems, smart grid technology hardware, fire-resistant materials, protective coverings, and hardware system upgrades to improve electrical infrastructure resilience in fire-prone areas, underground transmission lines for high voltage systems, submarine cable for power transmission across underwater environments, electrical transmission lines and components connected to substations; Maintenance services for electrical transmission systems hardware; Installation, maintenance, and repair of catenary structures and fiber optic systems hardware, overhead-to-underground conversion services for electrical transmission and distribution systems, and wiring underground cable for electrical transmission and distribution systems; Live-line maintenance and repair services for electrical transmission systems hardware; Live-line maintenance services, namely, rubber glove work for energized electrical systems hardware, and barehand work on energized electrical systems hardware; Excavation, trenching, and system hardware integration for high voltage systems; Arial installation, maintenance, and repair of electrical systems hardware; Emergency repair of electrical transmission cables and components connected to substations, and electrical systems utilizing live-line procedures to minimize downtime and ensure system reliability; Outage response services for overhead transmission lines, and overhead distribution systems, namely, pole replacement, conductor repair, and hardware system re-energization; Emergency repair services for underground transmission systems hardware, namely, excavation, cable replacement, and system integration, and underground distribution systems, namely, fault detection, cable splicing, and hardware system testing; Emergency pole repair and replacement services for wooden, steel, and composite poles used in transmission and distribution networks; Emergency repair services for insulators, conductors, cross-arms, during outage response operations, and substations to address outages, faults, or damage; Access road construction services for transmission line installation and maintenance; Right-of-way clearing services for electrical transmission systems; Site clearing services for submarine cable landfall areas; Substation maintenance services, namely, repair, replacement, and servicing of transformers, circuit breakers, switchesACTIVE—
042Engineering services in the fields of electrical transmission and distribution systems, live-line operations, smart grid technology, underground cabling, fire hardening for electrical infrastructure, overhead-to-underground conversion projects, underground and submarine electrical systems, outage response systems, optimizing outage response strategies and equipment deployment, optimization of live-line equipment, substation system layout, specifications, and integration, and substation maintenance, inspection, and optimization; Research and development in the fields of electrical transmission systems and infrastructure, materials and technologies for underground and submarine cable systems, rapid outage detection and response in transmission and distribution systems, live-line electrical procedures, helicopter operations, and high voltage system maintenance, and substation maintenance and inspection; Substation inspection services, namely, visual inspections, thermal imaging, condition assessments of electrical components and systems; Testing and diagnostics of substation equipmentACTIVE—
045Safety inspection services for live-line transmission operations and electrical projects; Safety inspection and monitoring services for transmission lines, overhead and underground transmission and distribution systems, and fiber optic systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 4, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 7, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 2, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 1, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 1, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 29, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Jun 29, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Apr 1, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 1, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 1, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 3, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 2, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 2, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 24, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Nov 24, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Aug 28, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 28, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 28, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 28, 2025DOCKASSIGNED TO EXAMINER—
Aug 13, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 3, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 3, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance