USPTO serial 99129268
Reviewed by CopyMark Law Group
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $300
Houston, TX, US
Houston, TX, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Chad Dougherty
Chad Dougherty Patterson + Sheridan, LLP24 Greenway Plaza Suite 1600Houston, TX 77046United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Transportable, modular and prefabricated buildings of metal; floating docks of metal, namely, modular, portable, prefabricated and floating structures of metal for the oil and gas industry, floating docks of metal, metal pontoons and structural supports therefor, and buoyancy metal cans used to support decking and floating structures; anchors being structures of metal; metal storage tanks; general purpose metal storage containers; large steel plate structures for the storage, transportation and processing of liquids and gases; metal pillars for buildings; metal reinforcement materials being structures of metal for building; framework of metal for building; prefabricated platforms of metal; floating docks of metal, for mooring boats; steel tubes and steel pipes; manifolds and pre-fabricated metal building assembly kits, branching tubes, rigid and flexible flow lines, risers, and non-mechanical winding tie-in spools for flexible hoses, all of metal for use with pipelines; steel molding plate; reinforcing materials of metal for pipes; metal storage tanks; metal fluid storage tanks; liquefied gas storage tanks of metal; metal tanks for storage featuring a floating roof; metal evaporation storage tanks for changing liquid into vapors; fittings of metal for building, namely, internal floating lids of metal for use with gas or liquefied gas storage tanks; building materials of metal, namely, metal building fascia and metal partitions of building; building panels of metal; steel plate; fittings of metal for building, namely, metal hose fittings, metal joinery fittings, metal pipe fittings, and ring-shaped fittings of metal; mooring bollards of metal; prefabricated components of metal for building, namely, platforms, walls, silos, pavilions, and garages; clips of metal for cables and pipes; common metals, unwrought or semi-wrought; process equipment and internals for the exploration, production, refining, storage, transport, distribution and processing of natural resources, liquids, and gases, namely, metal pipes for liquid and gas transfer, metal pipe fittings, metal penstock pipes, metal pipes and conduits, containers of metal for liquid fuel, metal storage tanks, metal cylinders for compressed gas or liquids, sold empty, mesh wire with a multifilament component, expanded metal intertwined with a multifilament component | ACTIVE | — |
| 007 | machines for oil development and refinement; offshore pipe-handling machinery for handling tubular pipes; Industrial refining and petrochemical machinery and equipment, namely, chemical reactors, internal parts for chemical reactors, chemical reactor injectors, petrochemical refining reactors, refining reactor vessels and associated subsystems, distillation and petrochemical plants machinery, apparatus and installations for the production of petroleum and petroleum coke, petroleum production machinery, apparatus and installations for the distillation, treatment and refining of chemical and petrochemical products, separating and refining machinery for chemical processing, heat exchangers, gas condensers, steam generators, distillation column, steam ejector machinery, coking units, machine coupling, except for land vehicles, and all parts for all of the aforesaid goods; oil-well pumping machinery for use in oil injection and gas compression operations in petroleum production industry | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 1, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 30, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 30, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 30, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 30, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 4, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 4, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 29, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 6, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 6, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 6, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 6, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 6, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 2, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 1, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 1, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 15, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 15, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 15, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 5, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 20, 2025 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Aug 20, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 9, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 9, 2025 | NWAP | NEW APPLICATION ENTERED | — |