Drawing for MERIT

USPTO serial 99147067

MERIT

Reviewed by CopyMark Law Group

Reg. 8085040Status 700Registered
Filing date
Status date
Registration date
Dec 30, 2025
Examiner
WLODARCZYK, CAROLYN A
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MERIT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Harris A Wolin

Harris A Wolin Myers Wolin, LLC100 South Jefferson Road, Suite 202Whippany, NJ 07981-1009United States

Goods and services

ClassDescriptionStatusFirst use
009Industrial automation controls; industrial electronic control systems for machines; Electrical integrated control systems for use in the field of power plant and energy storage systems electrical control equipment; industrial programmable logic controller (PLC); industrial power controllers; industrial electronic controllers for use with power converters; Downloadable industrial process control software; Meteorological instruments; industrial wireless communication devices for voice, data or image transmission; Electronic components in the nature of inverter-based electrical controllers, relays and switches for use with power plants and energy storage systems; Testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; Computer hardware and recorded software systems for the control of power plant equipment performance comprised of inverter-based electrical controllers and energy storage systems; Computer hardware and recorded software systems for controlling and regulating power plant and energy storage system energy output and loads; Computer hardware and recorded software systems for connecting and providing information on the status of power plant and energy storage system production performance and environmental impact parameters; Computer hardware and recorded software systems for Supervisory Control and Data Acquisition (SCADA) systems comprised of downloadable software and programmable electrical controllers for control and monitoring of power plant and energy storage system performance comprised of inverter-based electrical controllers; Computer hardware and recorded software systems for Meteorological (MET) stations comprised of meteorological instruments for the collection, storage, and communication of meteorological data of a power plant site; Computer hardware and recorded software systems for automated process control, namely, microprocessor-based hardware and downloadable computer software used to monitor the status of industrial processes, namely, power generation and energy storage system performance; Computer hardware and recorded software systems for monitoring communications and networking performance from inverter-based electrical controllers for use within power plants and energy storage systemsACTIVEJun 1, 2024
042Computer modeling services; Design of computer-simulated models; Computer graphics design services, namely, creating of power plant and energy storage system controls models; Technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; Remote monitoring of the functioning and use of electrical equipment, namely, power plant and energy storage system controls equipment; Monitoring of computer systems by remote access to ensure proper functioningACTIVEJun 1, 2024

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 30, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Jun 29, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 29, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 29, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 29, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 11, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
May 4, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 4, 2026ES7RTEAS SECTION 7 REQUEST RECEIVED—
Feb 2, 2026CHPNPOST PUBLICATION AMENDMENT – NOT ENTERED—
Feb 2, 2026APETASSIGNED TO PETITION STAFF—
Dec 30, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 30, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 1, 2025EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Nov 11, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 11, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 5, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 14, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 14, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 9, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 9, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 24, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 13, 2025DOCKASSIGNED TO EXAMINER—
Aug 27, 2025MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 27, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 21, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 21, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance