USPTO serial 99147129
WBI
Reviewed by CopyMark Law Group
Status 730Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- NUNLEY, CHRISTOPHER MICHAEL
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with WBI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,545*
Plus Government fees of $750
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patchen M. Haggerty
Patchen M. Haggerty Perkins Coie LLPP.O. Box 2608Seattle, WA 98111United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Operation of a business for others, namely, operation of pipelines, natural gas dehydration systems, compressor stations, metering stations, and energy facilities | ACTIVE | — |
| 037 | Laying, repair, maintenance, replacement and refurbishment of gas pipelines; Pipeline construction and maintenance; Construction planning; Construction of structures for the production of natural gas; Construction of structures for the storage of natural gas; Construction project management services | ACTIVE | — |
| 039 | Public utility services; Public utility services in the nature of natural gas distribution; Transmission of oil or gas through pipelines; Storage, distribution, and transportation of liquefied petroleum gas; Transportation and storage of fuels | ACTIVE | — |
| 040 | Generation of power; Generation of power through operation of power generation equipment and facilities; Processing of oil and gas; Processing of natural gas; Processing of liquefied natural gas | ACTIVE | — |
| 042 | Gas meter reading and data analysis; Pipeline inspection services; Design of pipelines; Custom design and engineering of pipelines, natural gas dehydration systems, natural gas compressor stations, gas metering stations, and energy facilities | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MDU Resources Group, Inc.
- Other trademarks owned by MDU Resources Group, Inc.
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named WBI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 10, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 9, 2026 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 9, 2026 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 9, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 9, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 14, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 14, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 8, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 14, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 13, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 28, 2025 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Aug 28, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 21, 2025 | NWAP | NEW APPLICATION ENTERED | — |