Drawing for MERIT SI SUSTAINABLE INFRASTRUCTURE

USPTO serial 99147171

MERIT SI SUSTAINABLE INFRASTRUCTURE

Reviewed by CopyMark Law Group

Reg. 8320767Status 700Registered
Filing date
Status date
Registration date
Jun 30, 2026
Examiner
WLODARCZYK, CAROLYN A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MERIT SI SUSTAINABLE INFRASTRUCTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Harris A Wolin

Harris A Wolin Myers Wolin, LLC100 South Jefferson Road, Suite 202Whippany, NJ 07981-1009United States

Goods and services

ClassDescriptionStatusFirst use
009Industrial automation controls; industrial electronic control systems for machines; Electrical integrated control systems for use in the field of power plant and energy storage systems electrical control equipment; industrial programmable logic controller (PLC); industrial power controllers; industrial electronic controllers for use with power converters; Downloadable industrial process control software; Meteorological instruments; industrial wireless communication devices for voice, data or image transmission; Electronic components in the nature of inverter-based electrical controllers, relays and switches for use with power plants and energy storage systems; Testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; Computer hardware and recorded software systems for the control of power plants equipment performance comprised of inverter-based electrical controllers and energy storage systems; Computer hardware and recorded software systems for controlling and regulating power plant and energy storage system energy output and loads; Computer hardware and recorded software systems for connecting and providing information on the status of power plant and energy storage system production performance and environmental impact parameters; Computer hardware and recorded software systems for Supervisory Control and Data Acquisition (SCADA) systems comprised of downloadable software and programmable electrical controllers for control and monitoring of power plants and energy storage system performance comprised of inverter-based electrical controllers; Computer hardware and recorded software systems for Meteorological (MET) stations comprised of meteorological instruments for the collection, storage, and communication of meteorological data of a power plant site; Computer hardware and recorded software systems for Automated process control, namely, microprocessor-based hardware and downloadable computer software used to monitor the status of industrial processes, namely, power generation and energy storage systems performance; Computer hardware and recorded software systems for monitoring communications and networking performance from inverter-based electrical controllers for use within power plants and energy storage systemsACTIVEMay 16, 2017

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 30, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 30, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 29, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 12, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 12, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 14, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 22, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 22, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 22, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 1, 2025AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Dec 1, 2025PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 24, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 13, 2025DOCKASSIGNED TO EXAMINER—
Aug 27, 2025MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 27, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 21, 2025NWAPNEW APPLICATION ENTERED—
Apr 21, 2025MAFRAPPLICATION FILING RECEIPT MAILED—

Frequently asked questions

Related guidance