Reviewed by CopyMark Law Group

Reg. 8385602Status 700Registered
Filing date
Status date
Registration date
Aug 4, 2026
Examiner
CANTONE, KERI H
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PHILLIPS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Adam S. Baldridge

Adam S. Baldridge Baker, Donelson, Bearman, Caldwell & Berkowitz, PC165 Madison Avenue, Suite 2000Memphis, TN 38103United States

Goods and services

ClassDescriptionStatusFirst use
037construction site preparation services being construction site preparation services, namely, excavation; pad preparation; rough and fine grading; site clearing; land clearing; subgrade preparation; utility trenching for water, sewer, gas, electrical, telecommunications and fiber optics; drilling for excavation purposes; roadbed and roadway subgrade preparation; slope grading; slope stabilization; wetland excavation and grading; and tree and stump removal as part of site clearing; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; drainage excavation and water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs being canal, ditch and channel excavation and regrading; levee and dike earthworks; dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation including retention and detention ponds, infiltration basins, culvert and spillway excavation; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; slope grading; slope stabilization; drainage excavation; water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs; levee and dike earthworks; dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation including retention and detention ponds; shoreline and bank shaping; Site development services for mining activities being mining and quarry overburden removal; cut and fill earthmoving; soil stabilization and compaction; subgrade preparation for processing pads and haul roads; Construction services being site clearing, excavation, right of way, and general contracting; power infrastructure preparation and construction services to permit transmission and distribution electrical power; construction and installation of security walls around power stations; power infrastructure preparation being wind turbine and solar array pad excavation; substation and generation facility pad preparation; trenching for electrical, telecommunications and fiber optics; access road subgrade preparation; rough and fine grading; soil stabilization and compaction; slope grading and stabilization; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Disaster response and recovery services for manmade and natural disasters being emergency excavation for utility repairs; environmental and remediation; contaminated soil removal; debris removal as part of site clearing; and restoration services in the field of water, wind, or fire damage; tree and stump removal as part of environmental remediation; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Wetland mitigation in the nature of shoreline and bank shaping; installation of erosion and sediment control measures; construction of channels, ditches and ponds to restore hydrologyACTIVE—
039Disaster-related hazardous materials management being hazardous materials warehousing; hazardous material spill site containment and cleanup; removal of contaminated soils; installation of temporary containment berms and liners; staging and overpacking of hazardous materials as part of cleanup operations; coordination of hazardous debris removal; site remediation servicesACTIVE—
040Disaster-related hazardous materials management being detoxification of hazardous materials; contaminated soil removal; environmental remediation excavation; site decontamination in the nature of cleanup of hazardous material releases; installation of temporary containment systems; and erosion and sediment control installation associated with cleanup operationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 4, 2026NRCSNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 4, 2026R.SRREGISTERED-SUPPLEMENTAL REGISTERYour mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application.
Jul 6, 2026CNTAAPPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER—
Jul 6, 2026IUAAUSE AMENDMENT ACCEPTED—
Jul 2, 2026AUPCAMENDMENT TO USE PROCESSING COMPLETE—
Jul 2, 2026IUAFUSE AMENDMENT FILED—
Jul 2, 2026EAAUTEAS AMENDMENT OF USE RECEIVED—
Jul 2, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 13, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Apr 13, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jan 13, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 22, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 22, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 22, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 25, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 25, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 25, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 22, 2025DOCKASSIGNED TO EXAMINER—
May 2, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
May 2, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 2, 2025NWAPNEW APPLICATION ENTERED—