USPTO serial 99167738
P
Reviewed by CopyMark Law Group
Status 688Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- CANTONE, KERI H
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with P?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*
Plus Government fees of $450
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Adam S. Baldridge
Adam S. Baldridge Baker, Donelson, Bearman, Caldwell & Berkowitz, PC165 Madison Avenue, Suite 2000Memphis, TN 38103United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Heavy highway construction, clearing, excavation, right of way, and general construction contracting services; construction site preparation services, namely, excavation, pad preparation, rough and fine grading, site clearing, land clearing, subgrade preparation; utility trenching for water, sewer, gas, electrical, telecommunications and fiber optics; construction site preparation services; construction site preparation services being drilling for excavation purposes, roadbed and roadway subgrade preparation, slope grading, slope stabilization, wetland excavation and grading; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation; drainage excavation and water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs being canal, ditch and channel excavation and regrading; construction of levee and dike earthworks; construction of dam and flood control earthworks; reservoir basin excavation and shaping; stormwater management excavation in the nature of excavating retention and detention ponds, infiltration basins, culvert and spillway excavation; roadway infrastructure site preparation services being roadbed and roadway subgrade preparation, slope grading, slope stabilization, drainage excavation, water infrastructure preparation services and preparations and construction of dams, levees, and reservoirs, levee and dike earthworks, dam and flood control earthworks, reservoir basin excavation and shaping; stormwater management excavation in the nature of constructing retention and detention ponds; construction services in the nature of shoreline and bank shaping; Site development services for mining activities being mining for metals and minerals and quarry overburden removal, cut and fill earthmoving, soil stabilization and compaction; subgrade preparation for processing pads and haul roads; Construction services being site clearing, excavation, right of way, and general contracting; power infrastructure preparation and construction services to permit transmission and distribution electrical power; construction and installation of security walls around power stations; power infrastructure preparation being wind turbine and solar array pad excavation; substation and generation facility pad preparation; construction services in the nature of trenching for electrical, telecommunications and fiber optics; construction services in the nature of access road subgrade preparation, rough and fine grading, soil stabilization and compaction, slope grading and stabilization; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Disaster response and recovery services for manmade and natural disasters being emergency excavation for utility repairs; contaminated soil removal being excavation services; debris removal as part of construction site clearing; restoration services in the field of water, wind, or fire damage; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations; Wetland mitigation in the nature of shoreline and bank shaping in the nature of construction; installation of erosion and sediment control measures; construction of channels, ditches and ponds to restore hydrology; hazardous material spill site containment and cleanup; installation of temporary containment berms and liners; staging and overpacking of hazardous materials as part of hazardous waste cleanup operations; installation of temporary containment systems for hazardous materials | ACTIVE | — |
| 039 | Disaster-related hazardous materials management being hazardous materials warehousing; coordination of hazardous debris removal being transport services | ACTIVE | — |
| 040 | Disaster-related hazardous materials management being detoxification of hazardous materials; environmental remediation excavation being treatment of soil; site decontamination in the nature of cleanup of hazardous material releases | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Phillips Infrastructure Corp.
- Other trademarks owned by Phillips Infrastructure Corp.
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Similar marks named P
- Prosecution event NOAM explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 21, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 26, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 26, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 20, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 29, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 26, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 26, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 26, 2026 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 13, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 13, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 13, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 22, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 22, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 22, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 25, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 25, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 25, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 22, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 15, 2025 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Sep 15, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 2, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 2, 2025 | NWAP | NEW APPLICATION ENTERED | — |