Drawing for ENFRA

USPTO serial 99172078

ENFRA

Reviewed by CopyMark Law Group

Reg. 8066836Status 700Registered
Filing date
Status date
Registration date
Dec 16, 2025
Examiner
PAQUIN, SAMUEL ROBERT
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ENFRA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jason P. Mueller

Jason P. Mueller FisherBroyles LLP14781 Memorial Drive #207Houston, TX 77079United States

Goods and services

ClassDescriptionStatusFirst use
037Construction project management services; Construction project management services in the field of commercial buildings; Construction services, namely, planning, laying out and custom construction of commercial buildings; Advisory services relating to building construction; Building construction services; Consultation services in the field of construction of environmentally-conscious buildingsACTIVEMay 1, 2025
042Engineering design services; Engineering drawing services; Engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; Engineering services for building and property condition assessment; Architectural and engineering services; Computer-aided engineering services for others; Engineering services in the field of energy efficiency; Consulting services in the field of industrial engineering; Product development and engineering services for others; Professional consulting services in the fields of engineering, land use planning, surveying, and environmental sciences; Structural engineering design services; Technical consulting in the field of environmental engineering; Technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Planning of buildings and infrastructure systems for buildings; Consulting services in the fields of energy measurement to improve energy efficiencyACTIVEMay 1, 2025

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 16, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 16, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 28, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 28, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 22, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 26, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 23, 2025DOCKASSIGNED TO EXAMINER—
Sep 17, 2025MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Sep 17, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 6, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
May 6, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance