Drawing for ELECTRIC HYDROGEN

USPTO serial 99175290

ELECTRIC HYDROGEN

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
BROWNE, LUCY E
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with ELECTRIC HYDROGEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,844*

Plus Government fees of $900

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

BRIAN J. FOCARINO

BRIAN J. FOCARINO COOLEY LLP1299 PENNSYLVANIA AVENUE NW, SUITE 700WASHINGTON, DC 20004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Energy generating installations, namely, electricity generators and hydrogen electricity generators; installations comprised primarily of machines being internal combustion engines for power generation for the production of hydrogen gas by electrolysis and related conversion of hydrogen gas into hydrogen-based fuels and chemical derivatives, including sustainable aviation fuel (SAF), methanol, and ammonia fuels; fuel dispensing pumps for service stationsACTIVE—
009Hydrogen generating systems comprised primarily of fuel cell stacks and also including membrane electrode assemblies, bipolar plates, current collectors, power conditioning components, and associated electrochemical conversion apparatus for generating electricity from hydrogen gas through electrochemical oxidation for the purpose of converting hydrogen into fuel; Hydrogen fuel cells; test stations for hydrogen generators and hydrogen fuel cells; Downloadable and recorded computer simulation software for simulating green hydrogen generation; downloadable and recorded simulation software for use on digital computers for simulating green hydrogen generation; downloadable and recorded software for computer system cleaning and optimization; electric and electronic sensors used for controlling power plants; power modules, namely, hydrogen modules comprised of fuel cells; downloadable and recorded software for monitoring energy output in the field of hydrogen energy; energy banks, namely, supercapacitors for energy storage; energy control devices, namely, electrical circuit switches; apparatus for controlling electrical energy, namely, electric control devices for energy management; downloadable and recorded computer operating software for use in hand-held mobile digital electronic devices and other consumer electronic devices; fuel consumption meters; electronic apparatus in the nature of energy meters for monitoring electricity consumption; downloadable computer software applications for energy management in the field of hydrogen energy; electronic devices, namely, electrical energy analyzers for tracking and monitoring energy usage; downloadable and recorded software for monitoring computer systems to ensure proper technological functioning; electronic apparatus and instruments in the nature of energy meters for monitoring electricity generation and consumption; electronic devices for testing and quality control, namely, apparatus in the nature of energy meters for analyzing energy output, consumption, and generationACTIVE—
011Alternative energy generation power plants, namely, hydrogen-based power plants; Hydrogen generators, namely, adsorption apparatus for generating hydrogenACTIVE—
037Construction services, namely, constructing infrastructures in the nature of hydrogen gas producers for the purpose of converting hydrogen into fuel; maintenance services, namely, maintenance of energy conversion equipment and infrastructures in the nature of hydrogen gas producers for the purpose of converting hydrogen into fuel; construction planning of hydrogen plants and production plants; installation and maintenance of integrated green hydrogen production apparatus; construction, installation, maintenance and repair services for hydrogen energy systems, not comprised of or including software; construction, installation, maintenance and repair services for energy production plants, including plants for production of hydrogen by electrolysisACTIVE—
040Custom construction of energy conversion equipment for converting hydrogen into fuel; Production and generation of energy; production and generation of electricity, energy, water, gas, fuel, hydrogen and ammonia; advisory and consultancy relating to the aforesaid services; providing information, including online, relating to the aforesaid services; all of the aforesaid services also provided via an online communications networkACTIVE—
042Design and development of renewable energy generation systems; technological research in relation to the design and development of hydrogen systems for energy generation; preparation of technical studies, namely, conducting scientific feasibility studies; provision of information regarding scientific research and technical scientific project studies relating to the use of renewable natural energy; scientific and technological services, namely, scientific analysis regarding third-party energy and electricity needs; technical scientific advice in connection with energy-saving measures, namely, energy measurement to improve energy efficiency; energy auditing; consultancy relating to technological services in the field of energy supply, namely, energy measurement consultancy to improve energy efficiency; scientific and technological services, namely, development of energy management systems; scientific and technological services, namely, design and development of energy distribution networks; scientific research in the field of energy; conducting scientific research and technical scientific project studies relating to the use of natural energy; advisory services relating to energy consumption, namely, advice related to the development of new products for energy consumption; scientific research in the fields of power conversion and hydrogen fuel cells; scientific and technological services, namely, development of hydrogen infrastructures and hydrogen refilling installations; Providing scientific research data and information to others in the field of reducing carbon emissions and decarbonization; technological consultancy in the fields of clean energy production, renewable energy storage, industrial decarbonization, disaster resilience, fuel cell electric vehicles (FCEVs) and renewable hydrogen infrastructure for transportation; industrial analysis and industrial research in the field of hydrogen gas and derivative products produced with hydrogen gas such as ammonia, methanol and synthetic fuels; industrial design services; environmental sustainability consultancy and assessment services, namely, consulting services in the field of environmental assessment and planningACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Oct 27, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 1, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 1, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 26, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 10, 2026EXPTEXPARTE APPEAL TERMINATED—
Aug 7, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 7, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 7, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Aug 7, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 7, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 27, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 27, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 27, 2026ALIEASSIGNED TO LIE—
Jul 23, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 23, 2026EXPIEX PARTE APPEAL-INSTITUTED—
Jul 23, 2026JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jul 23, 2026EXAFEXPARTE APPEAL RECEIVED AT TTAB—
May 7, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 7, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 7, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 1, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 30, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 30, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Dec 17, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Sep 30, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 30, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 30, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2025DOCKASSIGNED TO EXAMINER—
Sep 17, 2025MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Sep 17, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 8, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
May 8, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance