Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
KIM, BARBARA G
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with EVERWIND?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $3,638*

Plus Government fees of $1,800

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James F Keenan

Bernstein Shur100 Middle StreetPortland, ME 04104

Goods and services

ClassDescriptionStatusFirst use
001Ammonia for industrial purposes, namely, ammonia for use in drug manufacturing; Ammonia for industrial purposes, namely, ammonia for use in fertilizers; Ammonia for industrial purposes, namely, ammonia for use in plastics; ammonia volatile alkali for industrial purposes; hydrogenACTIVE—
004gaseous hydrogen fuel; gasoline; hydrogen fuel; industrial gasoline; liquid hydrogen for use as fuel; liquid hydrogen fuel; motor fuels, namely, gasoline and diesel fuels; motor gasoline; petroleum; petroleum products, namely, crude oils; raw petroleum; refined petroleum; renewable transportation fuelsACTIVE—
007Electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sources, namely, combined hydrogen and fuel cell power generation system comprised of fuel cell stacks, automatic electronic control valves for regulating the flow of liquids and pressure sensors; electrical generators using hydrogen fuel cells; fuel cell electrical power generator with integrated hydrogen storage capacity for use in vehicle fuel management and power conditioning; Electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sources, namely, hydrogen and fuel cell power generation subsystem comprised of pump control valves, pressure regulating valves, motor pumps and compressors; water electrolyzer machine for use with hydrogen gas generators for generating hydrogenACTIVE—
009Electrolysis apparatus for laboratory use, namely, electrolysis apparatus for producing hydrogen and oxygen from water; electrolytic cells for generating hydrogen and oxygen; Electrolysis apparatus for laboratory use, namely, hydrogen electrolyzers; hydrogen fuel cells; solar panels and solar energy collectors, namely, evacuated tubes for the production of electricityACTIVE—
011Alternative energy generation power plants, namely, hydrogen generation plants for industrial purposes; hydrogen power plants; hydrogen energy storage plants; separators for the cleaning and purification of hydrogen gasesACTIVE—
012tug boatsACTIVE—
035import-export agencies in the field of energy; retail, wholesale and online retail store services featuring liquid hydrogen fuelACTIVE—
037construction of hydrogen generation installations for generating power; hydrogen gas vehicle fueling services; installation and maintenance of power generation equipment; installation of solar power systems; installation of wind power systems; installation, maintenance and repair of energy generation equipment; installation, maintenance and repair of solar installations for generating powerACTIVE—
039distribution of hydrogen energy to residential and commercial users; distribution of hydrogen gas to residential and commercial users; distribution of wind energy to residential and commercial users; Storage of gas, namely, hydrogen energy storage services; hydrogen gas storage services; storage of gaseous hydrogen fuel; storage of liquid hydrogen; transport of hydrogen fuel by pipeline; transport of liquid hydrogen by truck; transporting and delivering of energy being hydrogen by pipeline; transporting and delivering of energy being hydrogen by rail; transporting and delivering of energy being transmission of hydrogen through pipelines; transporting and delivering of hydrogen to be used as a fuel in stationary fuel cell systemsACTIVE—
040custom production of low carbon hydrogen fuel for use in fuel and chemical production for others; generation of electricity from renewable sources; generation of electricity from solar energy; generation of electricity from solar power; generation of electricity from wind power; liquefaction of hydrogen gas services; production of energy; production of wind energyACTIVE—
042conducting of technical feasibility studies, analyses and evaluations in the field of new hydrogen technology; consultation in the research and development of hydrogen power and hydrogen powered products; design and development of hydrogen production technology; design consulting in the field of fuel cells and hydrogen energy systems; designing and testing of new fuel cell systems and hydrogen generators for others; designing industrial and commercial hydrogen systems; Engineering services, particularly technical engineering project management services in the field of fuel cells and hydrogen energy systems; Consulting services for others in the field of project design development in the field of fuel cells and hydrogen energy systems; Consulting services for others in the field of project management in the field of alternative energy generation; providing information in the design and development of fuel cells and hydrogen energy systems; research and development in the field of hydrogen gas technology; research and development in the field of wind energy; research and development in the field of hydrogen power and hydrogen powered products; scientific research and development in the field of renewable energy resources; technical design and planning of pipelines for hydrogen gas; testing of new products of others in the field of hydrogen power and hydrogen powered productsACTIVE—
045emergency response coordination services, namely, coordinating and providing personnel, equipment and expertise in response to alarms to assist in dealing with emergency situations which involve the escape and potential escape of pollutants, dangerous substances and other substances harmful to life and the environmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Sep 29, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 4, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 4, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 29, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 7, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 7, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 7, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Jul 7, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 7, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 9, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 9, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 6, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Mar 6, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Dec 17, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 2, 2025DOCKASSIGNED TO EXAMINER—
Nov 18, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 15, 2025TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Jul 15, 2025PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jul 14, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 14, 2025NWAPNEW APPLICATION ENTERED—