Drawing for FORGENT

USPTO serial 99299965

FORGENT

Reviewed by CopyMark Law Group

Status 730Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
SONNEBORN, TRICIA L
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 730: Status 730 means you filed the first six-month extension to delay filing a Statement of Use after a Notice of Allowance. You must file a Statement of Use or another extension before the new deadline.

Need help with FORGENT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

TAL GRINBLAT

TAL GRINBLAT LEWITT, HACKMAN, SHAPIRO, MARSHALL & HARLAN16633 Ventura Blvd., Suite 1100Encino, CA 91436United States

Goods and services

ClassDescriptionStatusFirst use
009Transformers; Electrical transformers; Distribution transformers; Electric transformers; Electric voltage transformers; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; Electrical relays and transformers; Electric junction boxes; Electric junction box housings; Circuit breaker panel boards; Lighting panel control boards; Switchboards; High and low voltage switchboards; Electrical arc detection and suppressing device used in low voltage switchgear; Electrical switchgear, namely, voltage boosting devices for electric power lines; Electric relays; Electrical ducts; Ducting for electric cables; Wires, electric; Electric cables and wires; Electronic docking stations; Chargers for electric batteries; Charging stations for electric vehicles; Electrical apparatus, namely, charging stations for charging electric vehicles; Electric control devices for energy management; Electric current control devices; Electronic control circuits for electric energy management, conversion, transmission and inversion devices; Trip unit for circuit breakers; Remote circuit breaker control switch operators; Circuit breakers; Circuit breakers and circuit closers; Components for electrical mains in the nature of electric wires and connectors; Electrical power distribution units; Power distributing boxes; Distribution boxes for electrical power; Electric switches; Electric current switches; Electric switch housings; Electrical switches; Automatic transfer switches (ATS); Automatic transfer switches; Components for electrical mains in the nature of automatic transfer switches (ATS); manual transfer switches (MTSs); static transfer switches (STSs); Electrical distribution systems, namely, power distribution panels; Electric power distribution machines; Medium voltage power distribution and protection component system composed of breakers and switchgears; Electrical components in the nature of protection relays; Electrical components in the nature of electric contactors; Components for electrical mains in the nature of electric junction boxes, panelboards, switchboards, switchgear, relay panels, bus ducts, wireways and control cabinets.ACTIVE—
042Electronic and electrical systems design servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 12, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 12, 2026EX1GSOU EXTENSION 1 GRANTED—
Aug 11, 2026EXT1SOU EXTENSION 1 FILED—
Aug 11, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 17, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 20, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 20, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 14, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 18, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 17, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 17, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 17, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2025GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Dec 17, 2025GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Dec 17, 2025EPENCOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY—
Dec 17, 2025CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Dec 10, 2025DOCKASSIGNED TO EXAMINER—
Dec 1, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 23, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 23, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance