Drawing for ECTOCLOUD

USPTO serial 99349909

ECTOCLOUD

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
GREEN, OCTAVIA M
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with ECTOCLOUD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,143*

Plus Government fees of $1,050

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jutta M. Frankfurter

Jutta M. Frankfurter RIEBLING IP, PLLC1717 Pennsylvania Avenue, N.W.Suite 1025Washington, DC 20006

Goods and services

ClassDescriptionStatusFirst use
009Downloadable computer programs for analysis and reporting of energy use, energy efficiency, energy conservation, energy cost analysis, energy administration, energy analysis, energy invoice management, energy-related environmental reporting and environmental impact analysis, and energy use trend reporting; downloadable software for planning, monitoring, analysing, controlling and running physical-world operations [internet of things]; power line transmission machines and apparatus; power lines conditioners; electric power converter; electric power distribution units transformers; power supplies transformers; electric power transformers for amplification; energy control devices, namely, thermostats, all the foregoing for use with community-wide or multi-user energy sharing systemsACTIVE—
011Apparatus for lighting, heating, steam generation, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes, and facilities for gas, heat, cooling and water in connection with the supply of the population, namely, heat pumps, heat sinks for use in heating, cooling and ventilating apparatus, heating installations, air-conditioning apparatus and installations, thermostatic valves as parts of heating installations, cooling installations for water, heat exchangers, other than parts of machines; heat pumps for energy processing; installations and furnishings, namely, heat accumulators, heat pumps, heating boilers, boiler pipes for heating installations, water coolers, absorption cooling installations, evaporator units, for use in the generation and transmission of cold local heating and cold road heating; all the foregoing for use with community-wide or multi-user energy sharing and conservation systemsACTIVE—
035Business management and planning for third parties in connection with the operation of facilities for the supply of electricity, gas, heat, cooling and water of the population; mediation of contracts for the supply of electrical and thermal energy and of gaseous fuels; business organizational and business consulting in the energy field; procurement services for others, namely, acquisition of goods and services for other companies in the energy field; preparation of financial statements regarding organizational and business issues relating to electrical and thermal energy, gas, water and wastewater; business management consulting services, namely, business and organization monitoring for business processes of electric and thermal energy, gas and water counters; development of business and marketing concepts for others in the field of energy technology; recording, processing, and managing consumption data for electricity, water, heat, and gas in databases for others conducting office work; recording energy, consumption, and ancillary cost data in databases for others conducting office work; preparing operating cost and consumption statementsACTIVE—
039Electricity distribution, gas supplying, heat supplying, and water supply; physical storage of electronically stored data or documents; public utility services in the nature of electrical power distribution; distribution of energy; water distribution; supply of electrical and thermal energy and gaseous fuels and water for the supply of consumers; storage, transport, distribution of electrical and thermal energy, gaseous fuels and water; transport and storage of waste; provision of transport via pipelines, all the foregoing for community-wide or multi-user energy sharing and conservation systemsACTIVE—
040Electricity generation; production of energy; air purification; air deodorization; recycling of waste and garbage; sorting of waste and recyclable materials; waste and garbage disposal, namely, waste processing, incineration of waste and destruction of waste; rental of electricity generators; rental of air conditioners; rental of air heaters; water treatment; generation of electrical and thermal energy in power plants, district heating plants, wind power plants, solar plants; generation of electrical and thermal energy from renewable energy sources, especially wind energy, water, solar, geothermal and biomass; production of biogas; wastewater treatment through mechanical or chemical purification, sewage treatment; chemical transformation, processing, destruction and incineration of garbage and waste; recycling of waste and garbage, all the foregoing for community-wide or multi-user energy sharing and conservation systemsACTIVE—
042Engineering, namely, technical planning for the operation of facilities for supplying the population with electrical energy, gas, heat, cooling and water; scientific and technological services, namely, research and design in the field of conservation and supply of energy and water; scientific research in the field of energy; design and development of data processing programs in the field of energy supply; technical measuring, namely, measurement evaluations in the field of measuring the consumption of electrical and thermal energy; consulting services in the fields of energy measurement to improve energy efficiency; energy auditing; technological consulting services in the field of energy conservation and environmental science; installation of computer software; computer software design; development and installation of computer software on networks, and configuration of computer networks using software, rental of computer software for planning, monitoring, analyzing, controlling and executing operations in the physical and virtual world in the fields of energy services and supply; providing of temporary use of non-downloadable online operating software for access to web servers and co-location servers for cloud computing and cloud data storage equipment of others; Providing SCADA Supervisory Control and Data Acquisition systems in the energy sector for use in monitoring and controlling infrastructure such as power plants, electrical grids, and renewable energy sources, for collecting real-time data from sensors and equipment, for energy management by automating processes and providing centralized oversight; all the foregoing for community-wide or multi-user energy sharing and conservation systemsACTIVE—
045Licensing of software; Licensing of protected rightsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Sep 1, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 7, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 7, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 1, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 9, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 2, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 2, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 2, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 4, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 12, 2026DOCKASSIGNED TO EXAMINER—
Jan 9, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 21, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 21, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance