Drawing for BRENNAN

USPTO serial 99356351

BRENNAN

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
DONEGAN, DANIEL P
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with BRENNAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Tara L. Ficken

Tara L. Ficken Husch Blackwell LLP8001 Forsyth Boulevard, Suite 1500St. Louis, MO 63105United States

Goods and services

ClassDescriptionStatusFirst use
035Vessel husbanding, namely, the coordination of and arranging for vessel-related services on behalf of seafaring clients while in port; Business operation of port facilities for others; Harbor freight logistics management; electronic data collection services in the fields of underwater structures, underwater facility assets, underwater infrastructure, and the benthic zone for business purposes using Light Detection and Ranging (LIDAR)ACTIVEDec 1, 1998
037Marine construction; Underwater construction; Construction services, namely, installation of environmental containment systems; Construction of dams; Building inspection in the course of water-based building construction; Inspection services in the course of construction of bridges, dams, locks, docks, port facilities, piers, wharfs, underwater pipelines, and underwater cable infrastructure; Underwater inspection services in the course of construction of bridges, shipping lanes, barge channels, docks, historical artifacts, dams, pipelines, cables, utilities, sea vessels, and nuclear power facilities; dredging; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Remedial construction services for electrical and mechanical systems, harbors, pipelines, buildings, docks, bridges, dams, piers, wharfs, and seawalls for others; Restoration of supporting structures for harbors, pipelines, docks, bridges, buildings, dams, piers, wharfs, and seawalls to prevent further degradation due to scour and erosion; Demolition, repair, and maintenance of waterway infrastructure, namely, ship and barge terminals, bridges, docks, harbors, shipping channels, dams, ports, wharfs, and canals; construction of large-scale waterfronts and marinas for public use; Installation, maintenance and repair of physical barriers placed on and around bodies of water for security purposes; Installation, maintenance and repair of railroads, gates, and actuators; Construction of transmission lines, transmission towers, bridges, and dams; Repair and maintenance of dams, hydroelectric dams, and locks; Concrete pouring services; Installation, maintenance and repair of gates and actuators; Installation, repair, and replacement of trash racks, headworks, water intakes for water control structures, cofferdams, fish passages through human-made structures, reinforced seawalls, and deep foundations for electrical towers; Soil erosion control services; Laying of sea cables, submarine cables, and underwater cables; dredging in the nature of pre-cable laying grapnel runs; installation of underwater cable protection systems; repair, maintenance, and removal of underwater cables; barge cleaning; Marine services, namely, providing dockside and dry-dock service to boats and watercraft in the nature of maintenance, repair, and installation of parts in the nature of hulls, topsides, decks, barge equipment, and structural parts essential to the functionality of marine vessels, and operational systems in the nature of drive systems, electrical systems, and hydraulic systems; Technical support services, namely, technical advice related to the repair of watercraft; custom construction services, namely, construction of erosion and scour countermeasures on waterways; Repair and remediation of scour and erosion damage, namely, concrete, metal, wood, and rock repair, installation, maintenance on dams, bridges, industrial docks, piers, and wharfs; real estate site selection for harbor dockside and raw commodity handling facilitiesACTIVEDec 31, 1963
039Diving and underwater salvage; Piloting of remotely operated vehicles; fleeting services, namely, marine towing; maritime traffic management services, namely, management of maritime vessel traffic flow by establishing harbor seaport waterways and traffic lanes using advanced communications network and technology; Waterway anchoring servicesACTIVEDec 1, 1998
040Water treatment services; Environmental remediation services, namely, treatment of contaminated soil, water, sediment, and sand in and around dams, bridges, industrial docks, piers and wharfs; Environmental remediation services, namely, dredging, capping and treatment of contaminated and impacted water, soil, sand, and sediment; weldingACTIVEDec 1, 1998
042Environmental engineering, testing and inspection services; Engineering services in the field of environmental compliance; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Environmental services, namely, design for others in the field of environmental engineering; Professional consulting services in the fields of engineering, land use planning, surveying, and environmental sciences; Pipeline inspection services; Underwater structural inspection services; Inspection services, namely, detection of leaks in dams, water vessels, underwater pipelines, docks, and underwater utility facilities; Design of pipelines; Research and development of new products; Environmental testing services, namely, treatability testing of sediment, slurry, and dredged material for the purpose of determining the process and chemicals needed for efficient impacted sediment and dredged material dewatering; hydrographic and underwater surveying; Providing scientific information, technical consulting, and research related to climate change preparation and resiliency; Engineering and habitat restoration design services in the field of coastline, lake, river, and wetland preservation; Locating and marking placement of underwater cable or wires; Civil engineering; Wetland habitat development and preservation services, namely, monitoring, testing and analyzing ecological success in the field of environmentally sensitive habitat conservation and preservation of native plants and wildlife; Photogrammetry services; Bathymetric Surveys; design and layout of harbor dockside and raw commodities handling facilities; LIDAR mapping services; consulting services in the field of LIDAR mapping services and data processing of scientific and environmental data, for non-business purposes; scientific and environmental data analysis to identify topological features by LIDAR survey data; acoustic imaging in the fields of underwater structures, underwater facility assets, underwater infrastructure, and the benthic zone to precisely identify, map, and evaluate underwater assets and conditions; Technical consultation in the field of environmental science and engineering servicesACTIVEDec 1, 1998
045Safety inspection services for underwater commercial structures; Permitting, namely, obtaining environmental, design, zoning and other governmental permits for development projects; underwater safety inspections services for bridges, shipping lanes, barge channels, docks, historical artifacts, dams, pipelines, intakes and outfalls of waterways, cables, utilities, sea vessels, wharfs, piers, docks, and nuclear power facilitiesACTIVEDec 1, 1998

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 29, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 29, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 23, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 31, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 17, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 17, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 17, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 20, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 20, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 20, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 9, 2026DOCKASSIGNED TO EXAMINER—
Aug 25, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 25, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 25, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance