Drawing for GTP

USPTO serial 99400176

GTP

Reviewed by CopyMark Law Group

Reg. 8375878Status 700Registered
Filing date
Status date
Registration date
Aug 4, 2026
Examiner
CALI, KRISTIN K
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GTP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ralph E. Locher

Ralph E. Locher Lerner Greenberg Stemer LLPP.O. Box 222480Hollywood, FL 33022United States

Goods and services

ClassDescriptionStatusFirst use
007Parts and components of engines and power units of all kinds, namely, starters for engine and small parts for ignition nozzles being electrodes, electrode tips, igniter pins, ignition devices for internal combustion engines for missile engine applicationsACTIVEDec 31, 2008
013Ammunition and projectiles being weaponsACTIVEDec 31, 2008
040Recycling of metals; recycling services; recycling of scrap metal and valuable materials, namely, tungsten based raw material; material treatment in connection with recycling; providing information on recycling of metallic waste; upcycling in the nature of waste recycling; contract manufacturing of prototypes of new products for third parties; reprocessing of metal components; recycling of metal components; recycling as compensation for reducing carbon dioxide emissionsACTIVEDec 31, 2008
042Inspection of metallic components, namely refractory metal-based components, for quality control purposes; scientific laboratory research in the field of metallurgy and recycling; performing scientific laboratory analysis and scientific laboratory testing on metallurgical products; scientific laboratory testing consulting services in the field of metallurgy; metallurgical research laboratory services; materials laboratory testing being materials testing; metallurgical laboratory research; laboratory services for metallurgical analysis; design and testing for new metallurgical product development; metallurgic product research and development; development of testing methods for evaluating the physical properties of metallurgical products; technical research, development and testing in the field of metallurgy; research and development of new metallurgical products; development of test methods and measurements of physical properties in the field of metallurgy; design and development of testing methods and analysis of tungsten-based materials and metal powders in the field of metallurgy; metallurgical product research and development servicesACTIVEDec 31, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 4, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 4, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 16, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 16, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 10, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 18, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 18, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 18, 2026XAECEXAMINER'S AMENDMENT ENTERED—
May 18, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
May 18, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 30, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 30, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 30, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 17, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2026DOCKASSIGNED TO EXAMINER—
Feb 10, 2026DOCKASSIGNED TO EXAMINER—
Feb 9, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 18, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 18, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance