Drawing for MANUFACTURING AMERICA’S INFRASTRUCTURE

USPTO serial 99405330

MANUFACTURING AMERICA’S INFRASTRUCTURE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
HANNA, RENE NICOLE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with MANUFACTURING AMERICA’S INFRASTRUCTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Nieberding

Michael J. Nieberding Thompson Hine LLP10050 Innovation Drive, Suite 400Dayton, OH 45342-4934United States

Goods and services

ClassDescriptionStatusFirst use
035Distributorship services in the field of construction and civil engineering products, namely, corrugated steel, aluminum, and plastic pipes, metal plate structures, detention/retention systems, geogrid and geotextile materials, erosion control products, concrete arch systems, retaining wall systems, bridge structures, bridge planks, collector pans, and hard armor productsACTIVE—
037Providing technical information concerning the installation of concrete arch structures, prefabricated steel truss bridges, structural metal plate, bridge planks, metallic drainage pipes, plastic drainage pipes, storm water detention structures, storm water treatment units, storm water filtration units, retaining wall systems and block, geogrids, geotextiles and hard armor products to civil engineers, design/build professionals and contractors in the fields of bridges, drainage, erosion control, grade change, pavement, rehabilitation, sanitary sewer, soil stabilization, storm water management and tunneling, via a computer networkACTIVE—
040Providing technical information concerning the manufacture of concrete arch structures, prefabricated steel truss bridges, structural metal plate, bridge planks, metallic drainage pipes, plastic drainage pipes, storm water detention structures, storm water treatment units, storm water filtration units, retaining wall systems and block, geogrids, geotextiles and hard armor products to civil engineers, design/build professionals and contractors in the fields of bridges, drainage, erosion control, grade change, pavement, rehabilitation, sanitary sewer, soil stabilization, storm water management and tunneling, via a computer networkACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 13, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 13, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 7, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 14, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 11, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 11, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 11, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 15, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
May 15, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Feb 17, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2026DOCKASSIGNED TO EXAMINER—
Feb 11, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 22, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 22, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance