Drawing for ON.AI UPS

USPTO serial 99408418

ON.AI UPS

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
FRYE, KIMBERLY
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with ON.AI UPS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,246*

Plus Government fees of $600

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Aaron D. Hendelman

Aaron D. Hendelman WILSON SONSINI GOODRICH & ROSATI650 Page Mill RoadPalo Alto, CA 94304-1050United States

Goods and services

ClassDescriptionStatusFirst use
009Circuits for heavy current; Current converters; Electric storage batteries; Electric transformers; High-frequency switching power supplies; Frequency converters; Voltage surge protectors; Voltage regulators; Voltage stabilizing power supply; Electrical power distribution units; Voltage surge suppressors; Electric converters; Inverters; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Medium voltage power distribution and protection component system composed of breakers and switchgears; DC/AC power converters; Uninterruptible electrical power supplies; Power supplies; Electricity router for managing and optimizing energy loads within a building; Transient voltage surge suppressors with power conditioning technology; Direct current converters; Power supplies for data centers, hospitals, warehouses, manufacturing facilities, food processing facilities, commercial business buildings, large residential complexes, vehicle recharging stations; High-voltage power supplies; Low-voltage power supplies; Electric control devices for energy management; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; AC/DC converters; AC/DC inverters; AC/DC power supplies; Electric circuits; Uninterruptible electrical power supply apparatus; battery energy storage systems comprised of batteries, power containers, and power converters; switchgear; downloadable energy management software.ACTIVE—
037Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Installation, maintenance and repair of batteries and accumulators; Electrical repairs and installation of uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Electrical repairs and installation of energy storage systems for critical power applications; Repair and maintenance of uninterruptible power supplies; Construction of transmission lines; Installation, maintenance and repair of apparatus for distributing electricity; Installation of reactive power compensation apparatus; Electrical contractor services; Installation, maintenance and repair of uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Installation, maintenance and repair of energy storage systems for critical power applications; Installation and maintenance of Uninterruptible Power Supply (UPS) and microgrid energy equipment.ACTIVE—
039Public utility services in the nature of electricity distribution; Distribution and transmission of electricity; Distribution of electrical energy; peak-shaving and ancillary service scheduling, namely, storage and distribution of energy that fluctuates based on overall energy demand.ACTIVE—
042Electronic and electrical systems design services; Remote monitoring of the functioning and use of electrical equipment, namely, uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Remote monitoring of the functioning and use of electrical equipment, namely, energy storage systems for critical power applications; Installation, maintenance and repair of software for managing and controlling uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Installation, maintenance and repair of software for managing and controlling energy storage systems for critical power applications; Design of power conversion devices; Research and development of technology in the field of power conversion; Electric meter data analysis; Software-as-a-Service (SaaS) featuring software for microgrid control, power-quality analytics, demand-response dispatch; Commissioning of Uninterruptible Power Supply (UPS) and microgrid energy equipment, namely, testing, functional testing, technical verification, and configuration of uninterruptible power supply and microgrid energy equipment.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Aug 11, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 16, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 16, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 10, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 19, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 12, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 12, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 12, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 13, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 9, 2026DOCKASSIGNED TO EXAMINER—
Feb 9, 2026MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 9, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 23, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 23, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance