Drawing for RIO BONITO CONSTRUCTION

USPTO serial 99436605

RIO BONITO CONSTRUCTION

Reviewed by CopyMark Law Group

Reg. 8363879Status 700Registered
Filing date
Status date
Registration date
Jul 28, 2026
Examiner
RAMOS, STEPHEN NMN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RIO BONITO CONSTRUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark H. Miller

Mark H. Miller Jackson Walker LLP1900 BroadwaySuite 1200San Antonio, TX 78215

Goods and services

ClassDescriptionStatusFirst use
037Construction of building foundations, retention ponds, livestock ponds, trenches for infrastructure, parking lots, earthen dams, buildings, cattle guards, fencing, and roads; excavation services for construction sites, namely, land maintenance and improvement in the nature of right-of-way and site clearing and maintenance, brush management; construction services, namely, installation of building sites, building pads, utility trenches, pipes, swales, retention ponds, culverts, and trenching for utilities; construction consulting services in the fields of land clearing designs, analysis of water diversion and retention options, water and land conservation plans, feasibility studies, livestock and wildlife recommendations, and real estate development being land improvement recommendations and land improvement value analysis; construction services, namely, road construction and maintenance in the nature of right-of way preparation, site clearing and grubbing, excavation and earthmoving, grading, utility trenching, road widening, and construction of storm water drainage and access roadsACTIVE—
039Junk, trash, debris removal and hauling material being transport servicesACTIVE—
042Consulting services in the nature of land and road surveying, namely, easement analysis; design of building sites, building pads, utility trenches, pipes, swales, retention ponds, culverts, and trenching for utilitiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 28, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 28, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 9, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 9, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 3, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 11, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 8, 2026XAECEXAMINER'S AMENDMENT ENTERED—
May 8, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 8, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
May 8, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
May 6, 2026XAECEXAMINER'S AMENDMENT ENTERED—
May 6, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 6, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
May 6, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 28, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 28, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 28, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 6, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 6, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 6, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 27, 2026DOCKASSIGNED TO EXAMINER—
Feb 11, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 10, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 10, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance