Drawing for MC UPS

USPTO serial 99460920

MC UPS

Reviewed by CopyMark Law Group

Status 601
Filing date
Status date
Registration date
—
Examiner
FRYE, KIMBERLY
Law office
TMO LAW OFFICE 113

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MC UPS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Aaron D. Hendelman

Aaron D. Hendelman Wilson Sonsini Goodrich & Rosati650 Page Mill RoadPalo Alto, CA 94304-1050United States

Goods and services

ClassDescriptionStatusFirst use
009Circuits for heavy current; Current converters; Electric storage batteries; Electric transformers; High-frequency switching power supplies; Frequency converters; Voltage surge protectors; Voltage regulators; Voltage stabilizing power supply; Electrical power distribution units; Voltage surge suppressors; Electric converters; Inverters; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Medium voltage power distribution and protection component system composed of breakers and switchgears; DC/AC power converters; Uninterruptible electrical power supplies; Power supplies; Electricity router for managing and optimizing energy loads within a building; Transient voltage surge suppressors with power conditioning technology; Direct current converters; Power supplies for data centers, hospitals, warehouses, manufacturing facilities, food processing facilities, commercial business buildings, large residential complexes, vehicle recharging stations; High-voltage power supplies; Low-voltage power supplies; Electric control devices for energy management; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; AC/DC converters; AC/DC inverters; AC/DC power supplies; Electric circuits; Uninterruptible electrical power supply apparatus; battery energy storage systems comprised of batteries, battery containers, and power converters; switchgear; downloadable energy management software; all of the foregoing for critical infrastructure and industrial applications, namely, manufacturing facilities, hospitals, water treatment plants, public utilities, fire stations, police stations, power stations, airports, train stations, and portsACTIVE—
037Installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Installation, maintenance and repair of batteries and accumulators; Electrical repairs and installation of uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Electrical repairs and installation of energy storage systems for critical power applications; Repair and maintenance of uninterruptible power supplies; Construction of transmission lines; Installation, maintenance and repair of apparatus for distributing electricity; Installation of reactive power compensation apparatus; Electrical contractor services; Installation, maintenance and repair of uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Installation, maintenance and repair of energy storage systems for critical power applications; Installation and maintenance of Uninterruptible Power Supply (UPS) and microgrid energy equipmentACTIVE—
039Public utility services in the nature of electricity distribution; Distribution and transmission of electricity; Distribution of electrical energy; peak-shaving and ancillary service scheduling, namely, storage and distribution of energy that fluctuates based on overall energy demandACTIVE—
042Electronic and electrical systems design services; Remote monitoring of the functioning and use of electrical equipment, namely, uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Remote monitoring of the functioning and use of electrical equipment, namely, energy storage systems for critical power applications; Installation, maintenance and repair of software for managing and controlling uninterruptible power supplies operating at low, medium, high or extra high AC or DC power; Installation, maintenance and repair of software for managing and controlling energy storage systems for critical power applications; Design of power conversion devices; Research and development of technology in the field of power conversion; Electric meter data analysis; Software-as-a-Service (SaaS) featuring software for microgrid control, power-quality analytics, demand-response dispatch; Commissioning of Uninterruptible Power Supply (UPS) and microgrid energy equipment, namely, testing, functional testing, technical verification, and configuration of uninterruptible power supply and microgrid energy equipmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 5, 2026MAB1ABANDONMENT NOTICE E-MAILED - EXPRESS ABANDONMENT—
Oct 5, 2026ABN1ABANDONMENT - EXPRESS MAILED—
Oct 2, 2026EXARTEAS EXPRESS ABANDONMENT RECEIVED—
Aug 21, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 14, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 14, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 14, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
May 14, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Feb 18, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 9, 2026DOCKASSIGNED TO EXAMINER—
Feb 9, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 24, 2025NWAPNEW APPLICATION ENTERED—
Oct 24, 2025MAFRAPPLICATION FILING RECEIPT MAILED—

Frequently asked questions

Related guidance