Drawing for DVI GRID SOLUTIONS

USPTO serial 99486542

DVI GRID SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 8517383Status 700Registered
Filing date
Status date
Registration date
Oct 20, 2026
Examiner
TOOLEY, DAVID E
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with DVI GRID SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mary D. Baril

Mary D. Baril McGuireWoods LLP800 East Canal StreetGateway PlazaRichmond, VA 23219

Goods and services

ClassDescriptionStatusFirst use
039Utility services, namely, electricity power grid load shifting; technical consulting services in the field of electrical power distributionACTIVENov 5, 2025
042Engineering consulting services in the fields of electrical power distribution system infrastructures for micro grids, smart grids, and mission critical facilities; technical consulting in the field of electrical power distribution system infrastructure engineering, computer system analysis, data conversion of electronic information and engineering in the field of electrical power distribution system infrastructures; computer software design; Systems integration services in the nature of designing, developing, implementing, and maintaining smart grid and other electric, gas and water utility computer software applications, computer consulting and computer systems analysis regarding smart grid and other electric, gas and water utility computer software applications for electric, water and gas utilities, energy service providers and energy consumers; developing and managing of smart grid energy transmission, distribution and consumption software application systems and networks for others, namely, for electric utilities, energy service providers and energy consumersACTIVENov 5, 2025

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 20, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 20, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 30, 2026SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Sep 30, 2026CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Aug 25, 2026SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jul 15, 2026IUAFUSE AMENDMENT FILED—
Jul 15, 2026EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jun 16, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 21, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 21, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 15, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 25, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 25, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Mar 25, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 25, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 25, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 19, 2026DOCKASSIGNED TO EXAMINER—
Feb 12, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 9, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 9, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance