Drawing for ENERAMP

USPTO serial 99534338

ENERAMP

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
COFFEY, AARON
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with ENERAMP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ryan Gile

Ryan Gile Gile Law Group Ltd.1140 N. Town Center Dr., Ste. 100Las Vegas, NV 89144United States

Goods and services

ClassDescriptionStatusFirst use
007Solar-powered electricity generatorsACTIVE—
009Battery management system comprised of electric sensors and electronic control units that monitor battery performance and battery health; Monitoring systems and safety management systems for batteries comprised of electric sensors, battery performance monitors, and microcontrollers; Battery systems and devices comprised of inverters, electrical switchgear being voltage boosting devices for electric power lines, power controllers and downloadable software for regulating energy cells and modules for use with the operation and performance of energy storage systems; Thermal control and energy cooling and heating systems for batteries, battery systems, battery charging systems, and energy storage systems comprised of battery modules and devices in the nature of battery monitors and capacitor cells and modules for electricity storage; Monitoring systems and safety management systems for batteries, battery systems, battery charging systems, and energy storage systems comprised of battery modules and devices in the nature of battery monitors and capacitor cells and modules for electricity storage; Downloadable software for regulating batteries, battery systems, battery charging systems, energy cells and modules for use with the operation and performance of energy storage systems; An electronic measurement apparatus for use in the measurement of battery health and performance, and a downloadable computer software program that uses the foregoing data to trend, predict, and store data related to the health of the battery; Electric wires; Insulated solid copper wire; Insulated and uninsulated multi-filament electric cable; Battery cables and battery cable ground wires; Flexible electric cords; Electric cables for welding and mining machinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Nov 17, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 23, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Sep 22, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 22, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 16, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 26, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 15, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 15, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 15, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 21, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 21, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 21, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2026DOCKASSIGNED TO EXAMINER—
Feb 12, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 7, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 7, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance