Drawing for GRIDFLEX

USPTO serial 99558446

GRIDFLEX

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
EMILO, LORI ANNE
Law office
TMEG LAW OFFICE 108

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with GRIDFLEX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

E. Scott Johnson

E. Scott Johnson Baker, Donelson, Bearman, Caldwell & Berkowitz, A Professional Corporation100 Light StreetBaltimore, MD 21202United States

Goods and services

ClassDescriptionStatusFirst use
009Electronic power control and monitoring devices, meters, load controllers, substation sensors, and grid-edge devices for managing distributed electricity, power, energy, and hybrid energy grids and resources; Downloadable software for electricity, power, energy, and hybrid energy grid load management; Electronic data communication network devices, modems, routers, energy routers, load controllers, edge computing nodes, and voltage and temperature sensors for localized electricity, power, energy, and hybrid energy grid monitoring and control; Power line communication modems, data concentrators, data management devices, and headend communication devices; Power line metering systems, devices, meters, meter interface modules, and metering units for electricity, power, energy, and hybrid energy monitoringACTIVE—
011Power line, wired, and wireless load control devices, relays, switches, and programmable controllers for heating, ventilation, and cooling systems; Power line, wired, and wireless load control devices, relays, and signal converters for managing distributed residential energy assets, electric vehicle (EV) charging stations and smart chargers, solar photovoltaic (PV) inverters, heat pumps, residential battery storage systems, and residential thermal load devices, electric water heaters, underfloor heating, and thermal storage systems; Heating systems, electric boilers, hybrid heat pumps, and thermal buffer storage units having demand response and fuel source steering controlsACTIVE—
035Electricity, power, energy, and hybrid energy trading services; electricity, power, energy, and hybrid energy brokerage services; Electricity, power, energy, and hybrid energy supply management services; Electricity, power, energy, and hybrid energy virtual power plant management, resource demand and curtailment services, load management, market management, and balancing services; Power grid loading control and power grid scheduling services utilizing market information to dispatch assets and resources; Data aggregation and analytics services for utility trading and balancing of utility marketsACTIVE—
036Financial consulting services relating to electricity, power, energy, and hybrid energy market trading; Providing financial data and energy usage analysis of electricity, power, energy, and hybrid energy consumption and demand of electricity, power, energy, and hybrid energy for business insights and technical operationsACTIVE—
038Data transmission services via broadband over power lines (BPL) and wireless networks; Telemetric and remote electricity, power, energy, and hybrid energy grid management services enabling two-way communication with distributed assets for monitoring and control, including telemetry-based fault detection and diagnosticsACTIVE—
039Electricity distribution and supply services; Virtual power plant (VPP) services providing aggregation and dispatch of electricity, power, energy, and hybrid energy by controlling distributed assets, EV chargers, heat pumps, and battery storage devicesACTIVE—
042Software as a Service (SaaS) for electricity, power, energy, and hybrid energy grid management and load forecasting; Platform as a Service (PaaS) for managing electricity, power, energy, and hybrid energy systems; Power grid and energy system analysis, modelling and diagnostic services for demand, asset management, and maintenance of electricity, power, energy, and hybrid energy and related grids; Design and development of software and platforms for electricity, power, energy, and hybrid energy grids and related usage optimization; Providing technical data and energy usage analysis of electricity, power, energy, and hybrid energy consumption and demand of electricity, power, energy, and hybrid energy; Technical design and information technology (IT) design services relating to electricity power, energy, and hybrid energy generation, distribution, and supply; Technical design and information technology (IT) design services relating to systems and devices for generation, distribution, supply and management of electricity power, energy, and hybrid energy; Scientific and industrial research relating to electricity power, energy, and hybrid energy generation, distribution, and supply; Technological analysis relating to electricity power, energy, and hybrid energy generation, distribution, and supply; Development of electricity power, energy, and hybrid energy management systems; Consultancy and advice relating to technological services in the field of electricity power, energy, and hybrid energy generation, distribution, and supplyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 3, 2026XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Aug 3, 2026XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jun 2, 2026DOCKASSIGNED TO EXAMINER—
May 1, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 23, 2026DOCKASSIGNED TO EXAMINER—
Apr 9, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 19, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance