Drawing for SYLVAN

USPTO serial 99561019

SYLVAN

Reviewed by CopyMark Law Group

Reg. 8343204Status 700Registered
Filing date
Status date
Registration date
Jul 14, 2026
Examiner
SOUDERS, MICHAEL J
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SYLVAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Megan Mischler

Megan Mischler Baker & Hostetler LLP1050 Connecticut Ave, N.W., Suite 1100Washington SquareWashington, DC 20036

Goods and services

ClassDescriptionStatusFirst use
037Machinery installation; Roofing installation; Installation and maintenance of photovoltaic installations; Kitchen equipment installation; Providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operations; Plumbing maintenance advisory services; Vehicle maintenance and repair; Pipeline construction and maintenance; Gas turbine engine repair; Gas turbine engine cleaning services; Boiler and chiller installation, maintenance, cleaning and repair; Repair or maintenance of industrial furnaces; Repair or maintenance of air conditioning apparatus; installation and maintenance of HVAC systems; maintenance and repair of industrial conveyer systems, material handling lines, and rigging systems; construction project management services in the nature of construction supervision; repair and maintenance of conveyors; electrical contractor services; construction of steel structuresACTIVEJan 31, 2021
040Custom fabrication of pipes; Metal fabrication and finishing services for others; Custom fabrication of counter tops; industrial pipe fabrication services for othersACTIVEJan 31, 2021
042Industrial pipe design services; electrical systems design services in automotive, manufacturing, and industrial facilitiesACTIVEJan 31, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 20, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Sep 30, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Sep 21, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 2, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 22, 2026ES7RTEAS SECTION 7 REQUEST RECEIVED—
Jul 14, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 14, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 26, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 26, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 20, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 30, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 30, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 30, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 30, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 30, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 24, 2026DOCKASSIGNED TO EXAMINER—
Dec 22, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 22, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 22, 2025NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance