Drawing for THE FUTURE OF ROOFING. DELIVERED TODAY.

USPTO serial 99581783

THE FUTURE OF ROOFING. DELIVERED TODAY.

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
THOMPSON, HEATHER
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with THE FUTURE OF ROOFING. DELIVERED TODAY.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew J Curran

Matthew J Curran MAINE CERNOTA & CURRAN547 Amherst StreetSuite 300Nashua, NH 03063

Goods and services

ClassDescriptionStatusFirst use
017Adhesive sealants for use in roofing; Resin-based sealants for use on roofs, walls and pavements; Self-adhesive tapes, other than stationery and not for cosmetic, medical or household purposes; Rubber sealant for caulking and adhesive purposes; Adhesive sealants for general use; Adhesive sealant and caulking compound; Adhesive sealants for use in construction; Adhesive caulking compounds; Adhesive sealant compounds; Adhesive sealant mastic compounds; Adhesive sealant compound; Adhesive sealants; Adhesive tapes for industrial purposes; Adhesive tape for industrial and commercial use; Adhesive tapes for industrial useACTIVE—
019Non-metal shingles; Non-metal roofing shingles featuring an additional layer of roofing adhesive; Non-metal building products, namely, shutters, shingles, siding, and trim; Roofing slates; Slates for roof cladding; Roofing underlayment; Non-metal vent covers for roof deck protrusions, drains and pitch pans; Roof gutters, not of metal; Building seam tape; Seam tape for building; Roofing felts; Felt roof coverings; Asphalt roofing felt; Roofing felt; Asphalted roofing paper; Asphalt roofing paper; Tarred roofing paper; Asphalt-based coatings and sealants for use on roofs, walls and pavements; Bituminous roof coatings; Bituminous coatings for roofing; Non-metallic roof flashing; Cement fillers for use in roofing; Roofing membranes; Non-metal roofing; Roof coverings, not of metal; Waterproofing membranes for roofing, floors and walls; Tar coatings for use on roofs, walls and pavements; Roofing cement; Roofing, not of metal; Roof flashing, not of metal; Bitumen-based roofing sealants; Bitumen-based sealants for roofing; Asphalt-based roofing mastics; Non-metal roof coverings; Roofing fabrics; Tar-based sealants for roofing; Non-metal roofing panels; Non-metal roof panels; Adhesive mortar for building purposesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Jul 28, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 2, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 2, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 27, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 6, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2026DOCKASSIGNED TO EXAMINER—
Apr 27, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 7, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 7, 2026NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance