Reviewed by CopyMark Law Group

Status 730Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
BRUNDAGE, DAVID WILLIAM
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 730: Status 730 means you filed the first six-month extension to delay filing a Statement of Use after a Notice of Allowance. You must file a Statement of Use or another extension before the new deadline.

Need help with POWERING AMERICA'S FUTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*

Plus Government fees of $450

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark A Oathout

Mark A Oathout Oathout Law Firm3701 Kirby DriveSuite 960Houston, TX 77098

Goods and services

ClassDescriptionStatusFirst use
035Employment recruiting services; Recruitment and placement of personnel in the field of electric power infrastructureACTIVE—
037Construction project management in the nature of construction supervision; Installation, maintenance and repair of electric power infrastructure facilities, foundations, substations, apparatus, and transmission lines; Construction of civil engineering structures; Construction of transmission lines; Technical consultation in the field of building construction; Construction of electric power infrastructure facilities, foundations, apparatus, piers, poles, towers, transmission lines, and electrical substations, and construction of foundations for installation of large-scale, high-voltage transmission lines, namely, drilling footings, excavation, wet-process or case concrete pier installations; Construction of underground structures; Construction of structures for installation of large scale, high-voltage transmission lines, namely, setting steel poles, and construction of lattice towers; Installation of utilities in the nature of conductors, and transmission lines in construction sitesACTIVE—
042Electronic and electrical systems design services; Consulting services for others in the field of design, planning, and implementation project management of electric power infrastructure facilities, foundations, substations, apparatus, and transmission lines with testing for all of the foregoing; Engineering services in the field of electric power infrastructure facilities, foundations, substations, structures, apparatus, and transmission linesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 21, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 20, 2026EX1GSOU EXTENSION 1 GRANTED—
Oct 20, 2026EXT1SOU EXTENSION 1 FILED—
Oct 20, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 21, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 24, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 24, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 18, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 29, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 28, 2026DOCKASSIGNED TO EXAMINER—
Jan 10, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 7, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 7, 2026NWAPNEW APPLICATION ENTERED—