What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with Z ZACHRY CONSTRUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Courtenay B. Allen

Courtenay B. Allen Pizarro Allen PC270 N. Loop 1604 E., Suite 300San Antonio, TX 78232United States

Goods and services

ClassDescriptionStatusFirst use
036Preparation of quotes for construction cost estimation purposesACTIVE—
037Construction consultation; Construction management in the nature of construction supervision; Construction supervision; Construction project management in the nature of construction supervision; General construction contracting; Construction of buildings, civil engineering structures, energy and power generating installations in the nature of dams, roads, underground utilities, and housing pads; Construction of airport buildings, runways, and taxiways and installation and maintenance of airport electrical and lighting systems; Construction of roads, streets, highways, interchanges, bridges, and tunnels, and installation and maintenance of roadway electrical and lighting systems; Construction of dams, gates, locks and other waterway navigation facilities; Construction of water storage and flood control facilities; Construction of civil engineering structures, namely, concrete structures for streams, rivers and wetlands; Construction of medical establishments, commercial buildings, industrial buildings, data centers, high technology fabrication facilities, government buildings, hotels, hospitals, health care facilities, education facilities, manufacturing facilities, entertainment venues, sports arenas, criminal justice facilities, offshore gas facilities, offshore oil facilities, offshore wind turbine facilities, mass transit facilities; Construction of railway track, track bed, and installation and maintenance of railway electrical and catenary systems; Construction of railway stations, interchanges, bridges, and tunnels; Construction of power generation facilities; Construction of power transmission and distribution facilities; Construction of refining, petrochemical, metals and pharmaceutical facilities; Construction of water storage, transmission, and distribution facilities; Construction of water and wastewater treatment facilities; Construction of underground and above-ground utilities; Construction of civil engineering structures; Construction services, namely, excavation; Construction services, namely, earthworks services in the nature of building embankments; Construction services, namely, grading; Construction services, namely, construction of access roads and pad preparation; Construction services, namely, site clearing; Construction services, namely, asphalt paving; Construction services, namely, concrete paving; Construction and maintenance of pipelines; Building construction for rail infrastructure projects; Building construction for aviation infrastructure projects; Building construction for civil infrastructure projects; Building construction; Marine construction; Harbor construction; Hydro-electric facility construction; Environmental remediation services, namely, hazardous waste clean-up services; Mining services, namely, mining extraction; Construction of piers, docks, wharfs, and revetments; construction of facilities for storing water and chemicals; Construction of facilities for housing supervisory control and data acquisition (SCADA) systems; Construction of facilities for housing electrical and instrumentation systems; Construction of facilities for housing filtration and chemical injection systems; Construction of facilities for housing mechanical and piping systems; Construction of foundations for buildings; Construction services, namely, steel erection; Construction of piling; Construction of coffer damsACTIVE—
040Environmental remediation services, namely, treatment of soil, waste, and/or water; water and wastewater treatment servicesACTIVE—
041Providing information related to training in the field of general construction servicesACTIVE—
042Quality control for others in the nature of quality management services, namely, quality planning, evaluation and analysis, quality assurance, and quality control, in the field of construction; Construction planning in the nature of drafting construction plansACTIVE—
045Safety consultation in the field of construction site inspection and assessment; occupational safety consultancy and risk assessment services being safety planning and auditing to improve safety of construction workers on residential and commercial construction sitesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 3, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 3, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 28, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 1, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 1, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 1, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Oct 1, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 1, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 3, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 3, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 3, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 19, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 19, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 19, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 21, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2026GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 18, 2026DOCKASSIGNED TO EXAMINER—
May 8, 2026MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
May 8, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 20, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 20, 2026NWAPNEW APPLICATION ENTERED—