USPTO serial 99609110
BUILD FASTER
Reviewed by CopyMark Law Group
Status 653
- Filing date
- Status date
- Registration date
- —
- Examiner
- MASON, JARED MICHAEL
- Law office
- TMO LAW OFFICE 119
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BUILD FASTER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
MOLLY MACK CRANDALL
MOLLY MACK CRANDALL BROOKS KUSHMAN P.C.150 W. SECOND ST., SUITE 400NROYAL OAK, MI 48067-3846United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metallic transportable buildings, namely, frame supported stressed membrane buildings and metal structural parts therefor, namely, straight and curved beams and trusses, base plate angles, footing plates, bases, pads, butt joint and top joint splice plates, fabric holding caps, spreaders, ridge cones, bolts, nuts and washers, fabric panels, and ground anchors; component parts for stressed membrane buildings made of metal, namely, straight and curved beams and trusses, baseplate angles, footing plates, bases for use in supporting the frame of a stressed membrane building, metal pads for use in conjunction with frames for stressed membrane buildings, butt joint and top joint spliced plates for securing components of the frames of a stressed membrane building and fabric panels for use as walls and roofs for frame supported stressed membrane buildings, and ground anchors | ACTIVE | — |
| 019 | Prefabricated frame supported stressed membrane buildings not primarily made of metal and non-metal structural component parts therefore, namely, straight and curved beams and trusses, baseplate angles, footing plates, bases, pads, butt joint and top joint splice plates, fabric panels, and ground anchors, all sold as a unit; nonmetal component parts for stressed membrane buildings, namely, straight and curved beams and trusses, baseplate angles, footing plates, bases for use in supporting the frame of a stressed membrane building, pads for use in conjunction with frames for stressed membrane buildings, butt joint and top joint spliced plates for securing components of the frames of a stressed membrane building and fabric panels for use as walls and roofs for frame supported stressed membrane buildings, and ground anchors; frame supported tensioned fabric structures and structural parts therefor, namely straight and curved beams and trusses, base plate angles, footing plates, bases, pads, butt joint and top joint splice plates, fabric holding caps, spreaders, ridge cones, bolts, nuts and washers, fabric panels, and ground anchors; nonmetal component parts for frame supported tensioned fabric structures, namely, straight and curved beams and trusses, baseplate angles, footing plates, bases for use in supporting the frame of a tensioned fabric structure, pads for use in conjunction with frames for tensioned fabric structures, butt joint and top joint spliced plates for securing components of the frames of a tensioned fabric structure and fabric panels for use as walls and roofs for a tensioned fabric structure, and ground anchors | ACTIVE | — |
| 037 | Maintaining and repairing of stressed membrane buildings | ACTIVE | — |
| 042 | Custom designing and engineering of parts for stressed membrane buildings | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 13, 2026 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Aug 13, 2026 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Aug 13, 2026 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 12, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 12, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 12, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 20, 2026 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2026 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 22, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 22, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 22, 2026 | NWAP | NEW APPLICATION ENTERED | — |