Drawing for VA-KEX

USPTO serial 99625321

VA-KEX

Status 641Office Action
Filing date
Jan 30, 2026
Status date
Jun 2, 2026
Registration date
Examiner
SCHNELL, BENJAMIN L

Need help with VA-KEX?

CopyMark Law Group can help you respond to USPTO correspondence, keep a registration alive, or watch new filings against your mark.

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Deadline: Sep 2, 2026

Office Action issues

The USPTO examiner noted a potential prior-filed application conflict, requested clarification on some of your goods descriptions, and assessed an additional fee due to custom text used in the application.

Owner

  • VaughanAir USA, LLC

    Crofton, MD, US

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, ducts, namely, metal ducts for ventilation installations, metal ducts for ventilation, heating, air-conditioning for fire-rated ventilation systems, metal ducts for ventilation, heating, air-conditioning for blast-resistant installations, and metal ducts for ventilation, heating, air-conditioning for ballistic-resistant installations; Metal building materials, namely, walls, namely, metal fire-resistant walls; enclosures, namely, metal fire-resistant enclosures composed of metal panels; Ducts made of metallic materials, namely, galvanized metals, stainless steel metals, or specialty metals, for ventilation, heating, air-conditioning.ACTIVE
009Ducting for electric cablesACTIVE
019Non-metal building materials, namely, ducts made of non-metallic materials, namely, non-combustible materials and fiber cement core materials, for ventilation, heating, air-conditioning; Ducts, namely, non-metal ducts for ventilation installations, non-metal ducts for ventilation, heating, air-conditioning for fire-rated ventilation systems, non-metal ducts for ventilation, heating, air-conditioning for blast-resistant installations, and non-metal ducts for ventilation, heating, air-conditioning for ballistic-resistant installationsACTIVE

Prosecution history

DateCodeEvent
Jun 2, 2026GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILED
Jun 2, 2026GNRTNON-FINAL ACTION E-MAILED
Jun 2, 2026CNRTNON-FINAL ACTION WRITTEN
May 28, 2026DOCKASSIGNED TO EXAMINER
May 24, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 30, 2026MAFRAPPLICATION FILING RECEIPT MAILED
Jan 30, 2026NWAPNEW APPLICATION ENTERED

Related guidance